← All capabilities

Inspection & documentation

ISO 9001 is on every supplier’s home page. What arrives in the crate is not.

A certificate tells you a system exists. It does not tell you which dimensions were measured, on how many pieces, or what your customer’s engineer will receive when they ask for evidence. This page is the actual document pack, the inspection plan behind it, and the four things we do not test in-house.

Quality lab measuring the first two metres of an aluminium extrusion production run

The manifest

What ships with the order

Not “available on request” — issued with the shipment, because a certificate that arrives three weeks later is a delay on your site, not ours. The right-hand column is what each document actually proves, which is the part buyers need when their own customer asks.

DocumentCodeIssuedWhat it proves
Material certificateEN 5733.1Every orderAlloy, temper and chemical composition of the billet actually used — traceable to the heat number, not to a generic 6063 claim.
First-article reportDimensionalFAIEvery orderWall thickness, overall width and height, and any critical dimension you named, measured on the first two metres of the run.
Coating reportFilm and colourCRCoated ordersFilm thickness at five points per length against the minimum, plus colour measured against the retained approved sample.
Batch releaseSign-offBREvery orderThe order was inspected before packing, by a named person, on a dated record. This is the document that makes a claim possible.
Corrosion and weatheringThird-party3POn requestSalt spray and accelerated weathering results from an accredited laboratory — commissioned per project, not stock reports.
Full dimensional reportPer pieceDIMOn requestMeasured values rather than pass/fail, for projects where the receiving inspection needs numbers to compare against.

Ask for a sample pack before the first order. Any supplier can produce these once; the question is whether they are produced without being chased.

The plan behind the paperwork

What is measured, on what instrument, how often

This is the inspection plan for a typical architectural profile. It is written per part, so the frequencies move with the criticality of your section — but the structure does not change, and you can ask for the version written for yours.

CharacteristicInstrumentFrequencyLimit or standard
Alloy compositionOptical emission spectrometerEvery billet heatWithin EN 573 range for the declared alloy and temper
Cross-section dimensionsProfile projector, digital calliperFirst 2 m, then per lotDrawing dimension and tolerance class
Wall thicknessUltrasonic or destructive section8 points, first articleMinimum wall per drawing, not average
HardnessWebster, verified by VickersPer lotConsistent with the declared temper
Twist and straightnessSurface plate, feeler gaugeFull length, per lotPer tolerance class — measured over 6 m, not a short cut
Film thicknessEddy current gauge5 points per lengthMinimum, not nominal — the thin point is what fails
ColourSpectrophotometer against retained sampleEvery coated lotΔE limit agreed at approval
Surface roughnessRa gaugePer lot on anodized partsPer finish specification
Tensile propertiesUniversal testing machinePer heat, on requestYield, ultimate and elongation per alloy and temper

A supplier who claims to measure every piece on every characteristic is either running a very small order or not measuring. The honest answer is a written plan with frequencies, which is why we send one rather than a slogan.

Honest limits

What we do not test in-house

Four capabilities we do not have, and what we do instead. Knowing these before you ask is the difference between a quote and a surprise.

Salt spray

No in-house corrosion chamber. Neutral and acetic acid salt spray is run at an accredited third-party laboratory and the report is issued under their name, not ours.

Accelerated weathering

QUV and xenon-arc testing are outsourced. We will not quote a “10 year colour warranty” off the back of a paint supplier’s datasheet.

Fatigue and mechanical cycling

Out of scope. If your part is structurally cyclic, the testing belongs with a specialist laboratory and the design belongs with your engineer.

Metallography and grain structure

We check composition and hardness, not microstructure. Recrystallisation depth after welding or bending is not something we report.

Verification

How to audit us without trusting the certificate

  1. Ask for the inspection plan for your part, before the orderNot the ISO certificate. The plan names the characteristics, the instruments and the frequencies, and it is specific to your section. If it cannot be produced, the system exists on paper only.
  2. Book a pre-production audit, or send an inspectorWe welcome third-party inspection during the run, not only at the end. An inspector who sees the press and the die card learns more in an hour than a document pack shows in a week.
  3. Check one batch against its own paperworkPick a delivered batch, ask for the records for that batch, and compare the measured values to the drawing. This is the only test that cannot be prepared for in advance.

Records are retained for three years, so a batch delivered last year can still be reconstructed — including which die ran it and which billet heat it came from.

Want the document pack for a real order?

Send a section and a quantity. You will get the inspection plan written for that part, plus a sample of each document that would ship with it.

Request a sample document pack