10 mm slot · 50 mm module

50 Series Aluminium Profiles — Large Frames and Gantries (PG50)

50 series is where modular aluminium framing stops being a frame and becomes a structure. Built on a 50 mm module with a 10 mm slot and running up to 100×100, it is used for long spans, gantries, walk-on platforms and machine bases that are too large for 40 series to hold straight. Some catalogues list the range as PG50.

10 mmslot width50×50 → 100×100common section rangeM8 / M10typical fastenersUp to 6,000 mmsingle-piece length

7 items

Products in this category

50 x 50 four-slot aluminium profile section

50 x 50 mm Aluminium Profile for Precision and Aerospace Fixtures

50 x 50 mm four-slot aluminium extrusion in 6063-T5 for inspection and assembly fixtures. 3.1 kg/m, tension stretched, supplied cut and machined with locating faces flat to 0.05 mm per metre.

MaterialAluminium
ToleranceEN 755-9, wall +/-0.15 mm; straightness 1.5 mm per metre; twist 2 degrees
FinishMill finish, or anodised AA15 to EN ISO 7599 on handling surfaces
Minimum order150 m, or 30 m for a single fixture trial
Lead time22 to 30 days for cut and machined material, plus 5 to 8 days air freight
Full specification →
50 x 50 four-slot aluminium profile section

50 x 50 mm Four Slot Aluminium Strut Profile Heavy Frame Cross Member

50 x 50 mm four slot T-slot strut aluminium profile in 6063-T5, about 3.1 kg/m and about 25 cm4. M8 slots on a 35 mm pitch and a 12 mm centre bore tapped M14 for an M12 through bolt.

MaterialAluminium
ToleranceEN 755-9 / GB/T 6892, wall plus or minus 0.15 mm
FinishMill finish / clear anodised / black anodised
Minimum order350 m
Lead timeTypically 20 to 30 days after deposit for mill finish
Full specification →
Aluminium Profile Truck Body Frame 50 x 100 mm for Dry Freight Boxes

Aluminium Profile Truck Body Frame 50 x 100 mm for Dry Freight Boxes

50 x 100 mm six slot aluminium profile at about 5.40 kg/m for dry freight box body framing, with M8 and M10 slots, cut to a body cut list and available anodised for wet and salt exposure.

MaterialAluminium
ToleranceCut length +/-0.5 mm, hole position +/-0.2 mm, section to EN 755-9
FinishMill finish / clear anodised / black anodised; anodising recommended where the frame meets steel
Minimum order200 m, or one body set, whichever is greater
Lead time2 to 3 weeks for mill finish, plus about a week for anodising
Full specification →
PG50 100×50 mm Six Slot Aluminium Strut Profile Rectangular Machine Beam

PG50 100×50 mm Six Slot Aluminium Strut Profile Rectangular Machine Beam

A 100 x 50 mm six slot PG50 aluminium strut profile with slots on all four faces, 6.8 x 6.8 mm M8 corner holes and a Ø12 mm M14 centre bore. A machine beam that carries a load and mounts the fittings.

MaterialAluminium
ToleranceEN 755-9 / GB/T 6892, wall +/-0.15 mm
FinishMill finish / clear anodised / black anodised
Minimum order150
Lead time22-32 days after deposit for mill finish
Full specification →
Strut Aluminium Profile 50×100 mm 2-Slot Heavy T-Slot Beam Extrusion

Strut Aluminium Profile 50×100 mm 2-Slot Heavy T-Slot Beam Extrusion

50 x 100 mm heavy two-slot T-slot strut aluminium beam in 6063-T5, about 6.2 kg/m, with two parallel slots along each 100 mm face and a O 12 mm centre bore tapped M14. For large machine frames, robot bases, machine tool guarding and storage racks where the beam's own weight is a design load.

MaterialAluminium
ToleranceEN 755-9 / GB/T 6892, wall plus or minus 0.15 mm
FinishMill finish / clear anodised / black anodised
Minimum order200
Lead time25-35 days after deposit for mill finish
Full specification →
T-Slot Nut 50 Series M10 Hammer Nut for 50×50 Aluminium Extrusion

T-Slot Nut 50 Series M10 Hammer Nut for 50×50 Aluminium Extrusion

M10 hammer-head T-slot nut for the 10 mm groove of 50 x 50 mm and 60 mm aluminium extrusion, for column feet, base plates and machine mounts. Carbon steel zinc plated or 304 stainless, torque ceiling about 30 N m.

MaterialCarbon steel / 304 stainless steel
ToleranceThread to ISO 965-2 6H, head width -0.15 mm on the groove cavity
FinishZinc plated (clear trivalent) / passivated stainless
Minimum order4000
Lead time16-26 days after deposit for zinc plated, 22-32 days for 304
Full specification →

50 series aluminium profiles are slotted extrusions on a 50 mm module with a 10 mm T-slot, in sizes such as 50×50, 50×100 and 100×100. They take M8 and M10 fasteners and are chosen for spans and structures that 40 series cannot hold within tolerance — gantries, walk-on platforms, long machine beds and overhead frames.

Below: why large frames fail differently from small ones, how to think about a gantry as a two-axis problem, and when a bolted aluminium structure stops being economical.

What changes when a frame gets large

On a small frame, stiffness comes from the joints and the bracing; the members are rarely the problem. On a large frame the situation reverses. A span of several metres will deflect under its own weight before any load is applied, and the deflection is what limits the design.

Three effects appear as size increases, and all of them are non-linear.

  • Deflection grows with the cube of the span. Doubling a bay length multiplies the deflection by eight. This is why large frames are laid out around support positions rather than around member sizes.
  • Self-weight becomes a load. A long aluminium member carries its own mass, and a walk-on platform carries a live load that has to be designed for, not estimated.
  • Torsion becomes a design case. A short member is loaded in bending; a long one is often twisted as well, and a closed or braced section resists torsion far better than an open one.

The common sections

SectionSlotsTypical roleNotes
50×504Posts and general members in a large frameThe base member of the series
50×1006–8Main beams, platform edges, gantry railsDepth in the bending plane is the whole point
50×1508–10Long unsupported beamsOften cheaper than a 100×100 for one-direction bending
100×1008Columns, heavy bases, gantry legsStiff in both directions
100×20010–14Structural beams and platform main membersWhere the frame effectively becomes a beam structure

A gantry is a two-axis problem

Gantries are the most common reason to move to 50 series, and they are also where most design mistakes happen, because the load and the motion are in different directions.

The beam carries a moving load

A gantry beam is not a simply loaded beam. The trolley position moves, so the worst case is usually the trolley near mid-span, and the deflection at that point decides the accuracy of whatever is mounted on the trolley. Deflection under a moving load also produces a change in the tool or sensor height, which matters more than the absolute deflection value.

The beam also twists

A trolley running on one face applies an eccentric load, which twists the beam. Two members bolted side by side behave very differently from one member of the same total weight, because the pair resists twist far better. Where a gantry has to be accurate, two parallel beams or a boxed arrangement is the normal solution rather than one deeper section.

The legs see bending too

Gantry legs are usually assumed to be in pure compression and are often under-sized as a result. If the beam is bolted rigidly to the legs, any beam deflection induces a moment at the top of each leg, so the legs need to be braced or the joint needs to be designed for that moment.

Practical point: if you can describe the gantry as a triangle rather than a rectangle, do it. Diagonal bracing in the plane of the legs costs a fraction of the aluminium it saves, and it removes the leg-bending case entirely.

Walk-on platforms and access structures

Where people walk on a structure, the design basis changes from stiffness to a defined load case, and the frame has to satisfy whatever standard the installation falls under. Three practical requirements come up repeatedly.

  • Deck support spacing is set by the decking material, not by the frame. Confirm the deck span before fixing the frame layout.
  • Guard rails and kick plates are part of the structure and load the frame laterally. They are built from the same profile family; see stairway and platform systems.
  • Anchoring to the floor is a structural connection, not an accessory. Levelling feet handle setting and levelling; the tie-down to the slab is a separate design item.

Assembly of large structures

A large bolted frame is assembled from parts that were each made to a drawing, so the accumulated error decides whether it goes together. Four measures keep a large frame buildable.

  • Cut to a cut list and mark every member. On a structure of a hundred members, unmarked parts are the main cause of site delays.
  • Tolerance the diagonals, not just the lengths. A frame goes square when its diagonals are equal; that is the dimension to inspect at assembly.
  • Use two load paths at every structural joint. At this scale a single connector is not adequate at a corner; use an anchor connector plus a joining plate, or two connectors separated along the slot.
  • Design for the lift. A 50 series structure is often too large to move in one piece. Design sub-frames that can be lifted and bolted together on site, and put the joints where access is easiest.

When a bolted aluminium structure is the wrong choice

50 series competes with welded steel, and it does not always win. A bolted aluminium structure is the right answer when the structure has to be re-configurable, when it has to be shipped flat and assembled on site, when it must not corrode, or when a clean anodised appearance is required. It is the wrong answer when the structure is permanent, when the loads are high and dynamic, when the required section goes beyond the range, or when deflection limits are tight and the aluminium section needed becomes larger than a steel weldment of the same stiffness. Where a project is on that boundary, a hybrid is often best: a bolted aluminium superstructure on a steel or concrete base.

Machining and finishing

Large structures need accurate ends and reliable end taps more than they need complex machining. We cut to ±0.3 mm with square ends, mark members to the cut list, and can add end taps, drilled and tapped holes, milled pads and counterbores in the same order. See CNC machining for the processes available. Satin anodised clear or black is the standard finish; on very large structures mill finish with site painting is sometimes specified for cost reasons. Film grades are described under anodised aluminium profiles.

Specifying a 50 series order

For large structures, send the layout and the load case rather than only a cut list. We can advise on span, orientation and bracing before the sections are fixed, which is where the cost is actually decided. State the section, the slot width, the finish, the cut list and the quantity, and mark which members carry structural joints. Standard sections are quoted within one working day. Related ranges: 40 series, 45 series, 60 series, stairway and platform systems and connecting elements.

FAQ

Questions buyers ask about this range

What is 50 series used for?+

Large frames, gantries, walk-on platforms, long machine beds and overhead structures - anywhere a 40 series section would deflect too much for the span.

Is 50 series strong enough for a walk-on platform?+

Strength is rarely the limit; the deck support spacing and the applicable structural standard decide the design. Confirm the load case and the standard the installation falls under before fixing the layout.

How long a span can a 50 series beam carry?+

There is no single answer because allowable deflection sets it. As a guide, keep unsupported spans under about 2.5 m for a 50x100 beam with a moderate load, and add supports rather than moving to a larger section.

Why does my gantry beam twist?+

A trolley running on one face applies an eccentric load. Two parallel beams bolted together resist twist far better than a single deeper section of the same weight.

Should gantry legs be braced?+

Yes, in most cases. A rigid joint between beam and leg transfers beam deflection into a moment at the top of each leg, and diagonal bracing removes that case cheaply.

Can 50 series be used outdoors?+

Yes, with a satin anodised finish at an appropriate film thickness, and with the sections detailed so water cannot stand in open slots.

Is 50 series better than welded steel?+

It is better when the structure must be re-configurable, shipped flat or kept corrosion-free. For a permanent, highly loaded base, a steel weldment is often stiffer per unit cost.

How do you make sure a large frame assembles?+

Cut to a cut list, mark every member, tolerance the diagonals rather than the lengths, and design sub-frames that can be lifted and bolted together on site.

Related product categories

40 Series Aluminium Profiles45 Series Aluminium Profiles60 Series Aluminium ProfilesStairway and Platform SystemsConnecting ElementsAnchor ConnectorsLevelling FeetAll products

Need this range specified for your project?

Send the drawing, the section size or a sample and we will confirm the alloy, the tolerance, the finish and the commercial terms. Quotes for standard items normally go out within one working day.

Request a quotation