Aluminium Extrusion Profiles 20 to 45 Series for OEM, up to 100 mm

OEM / ODM Available Free Sample Available Mill certificate to EN 10204 3.1, RoHS and REACH declarations, anodising film report, ageing record

Aluminium extrusion profiles for Tamil Nadu in 6063-T5, with full batch traceability from heat number to ageing record, first article and PPAP-style documentation, and heavy sections up to 100 mm.

Wholesale Price Quoted against section, documents, finish and quantity per per metre, per piece or per tonne
Material Aluminium
Alloy Grade 6063-T5
Temper T5
Section Size 20 to 45 series, and heavy sections to about 100 mm
Slot 8.2 mm on the common series, M6 and M8; heavier series to drawing
Length Saw cut to length, +/-0.5 mm, square or mitred
Tolerance EN 755-9, wall +/-0.15 mm
Surface Mill finish / clear anodised / black anodised / powder coated
MOQ Made to order; repeat OEM quantities preferred
Lead Time 4 to 6 weeks to an Indian port plus inland haulage and clearance
Loading Port Shenzhen, Shanghai, Ningbo
Supply Ability In-house extrusion, ageing, cutting, machining, anodising and export packing, with documented traceability
Payment Terms T/T 30 per cent deposit, balance against copy of bill of lading; L/C at sight on request
Trade Terms FOB, CIF, CFR, DDP on request
Certifications Mill certificate to EN 10204 3.1, RoHS and REACH declarations, anodising film report, ageing record
Request a Quote Reply within 24 hours
PG45 90 x 45 mm six slot heavy aluminium profile for Tamil Nadu OEM work
A 45 series heavy section. In OEM supply the documents and the traceability carry as much weight as the section itself.

01Extrusion profiles for the Tamil Nadu OEM belt

Tamil Nadu’s automotive corridor, Chennai, Kanchipuram, Hosur, Coimbatore and Tiruchirappalli, buys aluminium extrusion in a different way from a general fabricator. The buyer is often a tier one or tier two supplier to an OEM, and the purchase is judged on documentation and consistency, not only on the price per metre.

That means three things shape the order: traceability from the billet to the finished profile, first article and PPAP-style documentation, and a heavy section range for wind and heavy engineering work alongside the standard strut sizes. All three are covered below.

What traceability can you provide?

A chain from the billet heat number, through the extrusion batch and press run, to the ageing charge record with time and temperature, and then to the dimensional and film inspection on the finished profile. That is what a first article report and a PPAP-style submission rest on.

Can you supply first article and PPAP-style documents?

Yes. A first article inspection report, a dimensional report, a material certificate to EN 10204 3.1, a film thickness report for anodised work, and a process capability note on the critical dimensions. PPAP is an automotive framework the customer owns; we supply the evidence it requires.

PG45 90 x 45 mm six slot heavy aluminium profile section
A heavy 45 series section for OEM fixtures and heavy engineering. Larger sections need the higher press tonnage and a slower run.

02Traceability chain from billet to profile

A traceability claim is only worth as much as the records behind it. The chain below is the one we can show, in order, for a Tamil Nadu OEM order.

StageRecord keptIdentifiesDocument issued
Billet castingheat number, chemistry, supplierthe alloy batchmill certificate to EN 10204 3.1
Extrusionpress, date, batch, diethe run the profile came fromextrusion batch record
Ageingfurnace charge, time, temperaturethe temperageing record and tensile result
Cutting and machiningcut list, machine, operatorthe finished piecedimensional report
Anodisingline, charge, film thicknessthe finishfilm thickness report

The value of the chain is that when a dimension drifts, the extrusion batch and the ageing charge tell you whether it is one run or a trend. That is the whole point of traceability, and it is worth more than a certificate on its own.

03Documentation for an OEM submission

An OEM submission in Tamil Nadu typically asks for a package rather than one certificate. This table lists what is usually requested and what we provide.

DocumentWhat it showsDo we supplyTypical turnaround
Material certificate 3.1chemistry and mechanical propertiesyeswith the shipment
Dimensional reportsection, wall, cut, straightnessyeswith the shipment
First article inspection reportevery dimension on the drawing, first pieceyes1 to 2 weeks after the first piece
Film thickness reportanodising film in micronyes, for anodised workwith the shipment
Ageing recordcharge, time and temperature for the temperyes, on requestwith the shipment
Process capability notespread on the critical dimensionsyes, on requestafter 3 to 5 batches
RoHS and REACH declarationrestricted substancesyeswith the shipment

PPAP is a framework the customer owns; we supply the evidence that goes into it. If a tier one buyer needs a specific PPAP element, name it at the enquiry and the documentation is prepared to that format.

04Section range: standard strut and heavy sections

Tamil Nadu orders span both the light strut sizes for plant furniture and the heavy sections for wind and heavy engineering. The heavy sections are the ones that need to be checked against the press envelope first.

SeriesTypical sectionsUse in Tamil NaduWeight note
20 series20 x 20, 20 x 40, 20 x 80 mmfixtures, jigs, light frameslight, 0.8 to 2.5 kg/m
30 series30 x 30, 30 x 60, 30 x 90 mmworkstations, guards, small fixtures1.0 to 3.0 kg/m
40 series40 x 40, 40 x 80, 40 x 120 mmmachine frames, heavy fixtures1.3 to 4.0 kg/m
45 series45 x 45, 45 x 90 mm, six slotheavy frames, structural jigs2.5 to 5.5 kg/m
100 mm100 x 100 mm, eight slotwind and heavy engineering, large spans6 kg/m and up

For a wind or heavy engineering application the section is usually a strut or a box, and the limit is the press envelope and the wall ratio. Send the section drawing with the circumscribed circle and we will confirm the press before quoting.

05Local stock versus importing from China

This is the decision every Tamil Nadu buyer makes, and the right answer differs by section and by schedule.

FactorLocal Tamil Nadu supplierImport from ChinaComment
Lead timedays to 2 weeks4 to 6 weeksthe main trade-off
Unit price, large quantityhigherlowermetal and conversion both lower
Small quantitycheaper landedfreight dominatesbuy local
Section rangestandard Indian sizeswider, including heavyimport the heavy sections
Documentationvariesfull chainOEM work usually needs the chain
Flexibility on changeseasyharder after the orderlocal wins on changes

The common pattern: import the bulk and the non-standard sections, keep a local supplier for the urgent and the small, and let the documentation chain come from the import for the OEM submission.

06OEM supply versus general fabrication

OEM and tier supply

  • The purchase is judged on the document package
  • Batch consistency matters more than the lowest price
  • Traceability from billet to profile is required
  • The quantity is planned and repeatable
  • The buyer will audit the process records

General fabrication

  • The purchase is judged on price and speed
  • Any consistent batch will do
  • A material certificate is usually enough
  • The quantity is one-off or irregular
  • The buyer wants the cheapest landed section

07Failure modes in OEM supply

What goes wrongWhy it happensDesign it out by
First article fails on one dimensiona drawing dimension is at the edge of the extrusion tolerancereview the tolerance stack before the die is cut
Batch-to-batch drift on a critical wallthe ageing or the press run drifts between batcheshold the critical dimensions to a control limit, not just a spec
Document package incomplete at submissiona document was assumed rather than requestedlist the required documents at the enquiry stage
Heavy section outside the press envelopecircumscribed circle too large for the pressconfirm the envelope before the order
Temper not achieved on a heavy sectionquench set for the smaller sectionsstate the temper and the section together on the enquiry
Short of material on the lineimport lead time longer than the build schedulekeep a local supplier for the urgent top-up

08What to check before you order for Tamil Nadu

Procurement checklist for a Tamil Nadu OEM order

  • Confirm the section, alloy and temper, and the critical dimensions.
  • Confirm the circumscribed circle if the section is heavy.
  • Confirm the document package you need: FAI, dimensional, 3.1, film, ageing.
  • Confirm the traceability requirement and the batch marking.
  • Confirm the cut list and the machining if any.
  • Confirm the finish and the film thickness.
  • Confirm the port or inland route, and the trade term.
  • Confirm the packing, including any OEM marking or labelling.

09Questions Tamil Nadu buyers ask

Do you supply aluminium extrusion to Tamil Nadu?

Yes, in 6063-T5 and 6061-T6, to Chennai and the Tamil Nadu industrial belt, with a local delivery option through a Chennai port.

What traceability do you provide?

Heat number, extrusion batch, ageing charge record, and the dimensional and film inspection on the finished profile.

Can you supply first article and PPAP-style documents?

Yes: first article inspection report, dimensional report, material certificate to EN 10204 3.1, film thickness report and a process capability note on request.

What is the largest section you can make?

About 100 x 100 mm in the standard catalogue, and larger heavy sections on the higher-tonnage presses, subject to the press envelope.

Should I buy locally or import?

Import the bulk and the non-standard sections; keep a local supplier for the urgent and small quantities.

What is the lead time?

About four to six weeks for an import, plus inland haulage and clearance.

What we need to quote a Tamil Nadu OEM order

  1. The section drawing with the critical dimensions and tolerances.
  2. The alloy and temper, and the circumscribed circle for a heavy section.
  3. The document package you need for your submission.
  4. The traceability and marking requirement.
  5. The cut list, machining and finish.
  6. The quantity, and whether the order repeats.
  7. The port or delivery address, and the trade term.

Send those seven items and the quotation comes back with the material, cutting, machining, finishing, documentation, packing and freight broken out separately. Browse the full aluminium profile catalogue and the angle profiles range.

Supplying an OEM in Tamil Nadu with extrusion?

Send the drawing, the critical dimensions and the document package you need. We will confirm the press, the traceability and the price in one reply.

Request a quotation