40 x 40 mm four slot light wall PG40 aluminium strut profile in 6063-T5 with 10.2 mm grooves. About 25 per cent lighter than standard wall for guards, cable support and display frames.
| Material | Aluminium |
|---|---|
| Alloy Grade | 6063-T5 |
| Temper | T5 |
| Section Size | 40 x 40 mm |
| Slot | 4 x 10.2 mm groove, 8 mm mouth, 30 mm pitch, M8 |
| Length | 6 m stock, cut to drawing to +/-0.5 mm |
| Tolerance | EN 755-9 / GB/T 6892, wall +/-0.15 mm |
| Surface | Mill finish / clear anodised / black anodised |
| MOQ | 500 |
| Lead Time | 15-25 days after deposit for mill finish |
| Loading Port | Shanghai / Ningbo |
| Supply Ability | 600 t per month |
| Payment Terms | T/T 30% deposit + 70% before shipment | L/C at sight |
| Trade Terms | FOB | CIF | EXW |
| Certifications | ISO 9001:2015 | EN 755-9 | RoHS | REACH |
Structural framing · PG40 light wall
A 40 x 40 mm four slot light wall strut profile is the standard four slot 40 x 40 section with thinner walls. The outside is unchanged, the grooves are 10.2 mm with an 8 mm mouth on a 30 mm pitch, and the hardware is 40-series M8. The centre bore is Ø12 mm tapped M14 and the corner features are 5 x 5 mm tapped M6. What changes is the wall: light wall comes in at about 1.30 kg/m against about 1.75 kg/m for the standard, and its second moment of area is about 6.1 cm4 against about 9.2 cm4. We extrude it in 6063-T5 and supply it cut, drilled, tapped or machined.
Light wall is a purchasing decision as much as an engineering one, and it is worth doing the arithmetic properly because the saving is easy to overstate. The section is about 25 per cent lighter and therefore about 25 per cent cheaper per metre, but it is only about two thirds as stiff. On a frame with a fixed deflection limit that does not just mean a softer frame — it means the support spacing has to come down, and every extra support costs money and assembly time. Whether light wall wins depends on the ratio between those two costs, and that is a calculation, not a preference.

The light wall section is about 25 per cent lighter than the standard, and because extrusion is priced substantially by weight, that translates into roughly the same saving per metre. On a large frame that is a real number and worth chasing. But the saving is only on the member, and the member is not the whole cost of a frame.
The stiffness penalty is the other half of the story. At 6.1 cm4 against 9.2 cm4, the light section is about two thirds as stiff as the standard. Since deflection scales with the cube of span, matching the standard section’s deflection means reducing the span — and reducing the span means more supports.
| Property | Light wall | Standard wall |
|---|---|---|
| Weight | 1.30 kg/m | 1.75 kg/m |
| Second moment of area | approx. 6.1 cm4 | approx. 9.2 cm4 |
| Relative stiffness | 0.66 | 1.00 |
| Span for equal deflection | 87 per cent of standard | Reference |
| Supports needed for a given run | about 15 per cent more | Reference |
| Approximate material cost | about 25 per cent less | Reference |
Here is the calculation to run before specifying light wall. Take the span the standard section would use, multiply by 0.87, and that is the span the light section can use for the same deflection. The number of supports in a run of length L goes as L divided by the span, so reducing the span by 13 per cent increases the support count by about 15 per cent. Then compare two figures: the material saved, which is about 25 per cent of the member cost, against the cost of the extra supports, which is about 15 per cent more brackets, more feet and more assembly labour.
Purchasing rule of thumb: light wall is economic where the member is lightly loaded, spans are short, or supports are simple. Standard wall is economic where the member carries a load, spans are long, or a support is expensive to build. If in doubt, price both with the support count included rather than comparing the section price alone.
About 25 per cent, at roughly 1.30 kg/m against 1.75 kg/m for the standard wall in the same 40 x 40 envelope. Because extrusions are priced substantially by weight, the cost saving is of the same order.
No. The groove is still 10.2 mm with an 8 mm mouth on a 30 mm pitch, so 40-series hardware, covers and brackets all fit exactly as they do on the standard section.
About 87 per cent of the span the standard wall can carry for the same deflection. If the standard works at 1,200 mm, the light section works at about 1,045 mm.
Yes, about 15 per cent more for the same run and the same deflection limit. Whether that is acceptable depends on how much a support costs on your frame.
Yes, and it is often the right answer: light wall for the non-structural members and standard or heavy wall where the load is. The sections are interchangeable at the joints because the groove and pitch are identical.
Tell us the frame layout and what a support costs you. We will price light and standard wall with the support count included, then quote machining and FOB pricing.
Request a Quote