MOQ for Custom Aluminium Profiles

In 2026 a mill-finish 4040 off an existing die typically quotes about US$4.20–5.80 per metre FOB China once you clear the minimum. The minimum order is 150 m off an existing die and 500 m with a new die — the difference is whether the tooling already exists.

Existing die
150 m MOQ
New die
500 m MOQ
Price steps
500 / 2,000 / 5,000 / 10,000 m
Read
8 minutes
Warehouse stacks of bundled aluminium T-slot extrusions wrapped and strapped on pallets

Short answer

MOQ is set by die changeover and the need to amortise a tool that has no value to anyone else. If the section already sits in our die library, 150 m is the production floor. If the section is new, plan on 500 m plus the die charge, with die making adding 7–12 days before the press run. Price steps at 500 m, 2,000 m, 5,000 m and 10,000 m move the unit rate after you clear the floor. A single bar is a sample or a cut from stock, not a custom production order. Mixed sections can share one container, but each die still has to meet its own metre minimum. Payment is T/T 30% deposit + 70% before shipment, or L/C at sight, on FOB, CIF, DAP or DDP from Shanghai or Ningbo.

Long silver aluminium extrusion profiles strapped on a wooden pallet in a warehouse aisle
Existing-die runs often start around 150 m; new dies typically need ~500 m to amortise tooling.

What is the MOQ for 2020 profile

For a standard 2020 (and the other catalogue T-slot sizes in the same family) the MOQ is 150 m when the die already exists, and 500 m when a new die must be cut.

The number does not change just because the envelope is 2020 rather than 4040; what changes is how many kilograms that metre count represents, and therefore how the order sits against finishing-line minima. At ~0.50–0.55 kg/m, 150 m of 2020 is only ~75–85 kg, which is a short press run but a normal existing-die release. 500 m is ~250–275 kg and is the new-die floor. The same metre rules apply across the common industrial sizes; only the weight and the packing length differ.

SectionExisting-die MOQNew-die MOQ~kg at 150 mNotes
2020150 m500 m~75–85 kgLightest common T-slot
3030150 m500 m~130–150 kgWorkbench uprights
4040150 m500 m~210–240 kgDefault industrial frame
4080150 m500 m~360–420 kgWatch finishing bath load
4545150 m500 m~250–290 kg45-series library die
5050 / 8080150 m500 mhigher kg/mSame metre floor, heavier billet

Can I buy a single piece of 2020 aluminium profile

No — a single piece of a production extrusion is not a production order; it is either a paid sample cut from an existing die or a retail cut from stocked length, and neither rewrites the 150 m / 500 m floors.

If the die exists, we can usually cut one or a few bars for fit check at a short-run metre rate plus express freight. That sample does not create a path to reorder one bar at production pricing. If the die does not exist, a single piece still requires the die; the economic path is a paid pilot length inside the new-die programme, then the 500 m production MOQ. The same answer holds for 3030, 4040, 4080 and the rest of the catalogue: the envelope changes the weight, not the rule.

RequestPossible?Commercial path
1 pc 2020, existing dieAs sampleShort-run rate + express; then 150 m for production
1 pc 3030, existing dieAs sampleSame logic
1 pc 4040, new sectionOnly after dieDie + pilot, then 500 m MOQ
1 pc 4080 from stockIf stockedStock cut; not a custom die run
Mixed single bars, many sizesSamples onlyEach production die still needs its MOQ

What is the minimum order for a custom profile

A custom section that needs a new die has a 500 m minimum on the first production release, plus the die charge, because the tool has no alternate customer.

Die making typically adds 7–12 days before metal runs. The die fee is a separate line; how it amortises per metre is covered on the price-per-metre and die-cost pages. Ownership of the die after payment is a contract point — see who owns the extrusion die. A custom profile is not the same as a catalogue T-slot off a library die: the 150 m floor applies only when the tool already exists and is released for your alloy and finish.

Finishing can impose a second minimum. Anodising and powder lines often want a bath or oven load larger than a bare 500 m of a light section. Ask for the extrusion MOQ and the finishing MOQ as two numbers; the order must clear the higher of the two if you need coated metal.

What is the minimum quantity for a stock order

A stock or library-die order clears at 150 m per section, which is the existing-die MOQ, provided the alloy, temper and finish match what the die is set for.

“Stock” here means a die that already exists in the plant, not a promise that cut lengths sit on a shelf in every finish. Mill-finish releases are the simplest. A special anodise colour or a powder shade can reintroduce a finishing minimum even though the extrusion MOQ is 150 m. If you need less than 150 m of a library section for a repair, treat it as a sample or ask whether remnant lengths exist; do not assume production pricing.

Mixed-container path to MOQ. Different sections may ship in one container from Shanghai or Ningbo under one FOB, CIF, DAP or DDP booking. Each section must still meet its own 150 m or 500 m floor. A practical pattern for a frame programme is 150 m of 4040 + 150 m of 4080 + 150 m of 2020 braces on existing dies, rather than forcing one section to absorb the whole freight. New dies cannot borrow metres from a neighbour’s section.

Is there a price break for small orders by size

Yes — once you clear the MOQ, unit price steps down at 500 m, 2,000 m, 5,000 m and 10,000 m; below the MOQ there is no production break, only sample or surcharge pricing.

The table gives 2026 FOB Shanghai/Ningbo reference bands per metre for mill-finish 6063 industrial sections near the first step. Small orders that only just clear 150 m sit at the top of each band; crossing 2,000 m and 5,000 m is where the conversion adder thins. Die amortisation on a new tool is a separate per-metre adder until the die fee is recovered — see how die cost amortises per meter.

SectionCircumscribed circleTypeReference price (USD)Notes
2020~28 mmLight T-slotUS$1.80–2.60/mBreaks after 500 / 2k / 5k / 10k m
3030~42 mmLight T-slotUS$2.80–3.90/m150 m existing-die floor
4040~57 mmStandard T-slotUS$4.20–5.80/mMost common step ladder
4080~89 mmRectangularUS$7.20–9.80/mHeavier kg/m, same metre steps
4545~64 mm45-seriesUS$5.40–7.40/mLibrary die when available
4590~101 mm45-series wideUS$9.50–12.80/mConfirm finishing MOQ
5050~71 mm50-seriesUS$7.00–9.50/mSame 150 / 500 m rules
8080~113 mmHeavy T-slotUS$12.50–17.00/mOften planned by the tonne
9090~127 mmHeavy T-slotUS$16.00–22.00/mWatch press scheduling
100100~141 mmHeavy structuralUS$20.00–28.00/mNew die usually 500 m
16080~179 mmWide structuralUS$18.00–26.00/mLarge circle, confirm press

RFQ checklist — MOQ

  • Drawing or catalogue section — so we know existing die vs new die.
  • Metres per section — not only a total order weight.
  • Alloy, temper, finish — finishing may raise the floor.
  • Trial vs production — sample pricing is a different line.
  • Mix plan — which sections share the container.
  • Incoterm — FOB / CIF / DAP / DDP, Shanghai or Ningbo.

State whether each section is library or new. That single word decides 150 m or 500 m before anyone debates price.

Four MOQ mistakes

Combining different dies into one MOQMetres do not transfer across tools. Each custom section clears its own floor.
Treating a sample as production pricingA paid cut proves fit; it does not unlock the 150 m band for the next one-bar reorder.
Ignoring finishing minimaExtrusion at 150 m can still fail an anodise bath minimum. Ask both numbers.
Ordering 100 m to “test the price”Below MOQ you are in surcharge territory. A clean 150 m existing-die lot is the honest first production test.

Related on this site

Terms used in this article

Existing die
A tool already cut and released for the section, alloy class and press; unlocks the 150 m MOQ.
New die
A tool cut for your section; carries a die charge and a 500 m first-release MOQ.
Library / stock die
A catalogue section already tooled; not a guarantee of finished goods on the shelf.
Price step
A quantity threshold (500 / 2,000 / 5,000 / 10,000 m) where the unit conversion adder falls.
Pilot / sample
A paid short length for validation; commercially separate from production MOQ.

Questions buyers ask

What is included in the quoted price?

At FOB Shanghai or Ningbo the metre price for a MOQ lot covers extrusion, standard packing and export documentation for the stated alloy and finish. Die charges for a new tool are a separate line. Anodising, powder coating, CNC and cut-to-length beyond stock sawing are extra. CIF, DAP and DDP add freight and, for DDP, duty as agreed. Payment is T/T 30/70 or L/C at sight.

Do you charge for samples?

Yes for most short cuts: sample metres are billed at a short-run rate plus freight. On an existing die that is often a few bars. On a new die the sample follows die completion and does not waive the 500 m production MOQ. Say whether the sample cost should credit against the first production release.

How long is the quotation valid?

MOQ unit prices are usually valid 14–30 days in 2026, tied to billet. Die quotes may be held longer because steel and CNC time move slower than metal. If finishing chemicals or powder lots are involved, ask for a separate validity on that line.

Can the price be fixed for a contract?

Annual call-offs can fix the conversion adder and the MOQ rules (150 m / 500 m) while metal follows an agreed billet index. Price steps at 500 / 2,000 / 5,000 / 10,000 m should be written into the schedule. Incoterm and port stay FOB/CIF/DAP/DDP Shanghai or Ningbo unless amended.

Also searched as: aluminium profile MOQ China, custom extrusion minimum order, 150 m existing die, 500 m new die MOQ, can I buy one piece T-slot, aluminium extrusion trial order, mixed container MOQ profiles.

Send the section list and the metres

Mark each line as library die or new die, give metres and finish, and say whether you need a paid sample before the 150 m or 500 m release. We will confirm which floor applies before you commit.

Request a quote

Related reading

Twelve more engineering notes from this blog, picked for this article — plus every category below.

Leave a Reply

Your email address will not be published. Required fields are marked *