Cable routes · snap-in covers · L-sections · stock vs tooling

Aluminium Conduit Profiles & Angle Sections

Three questions land on our desk all the time: how to run cable inside a frame with snap-in covers, whether an aluminium wireway is really better than a steel tray, and when a standard angle will do instead of a new die. They sound like three product questions. They are one question: what happens to this machine after it has been running for three years and somebody needs to add one more cable? We extrude and machine these parts in Foshan, and that is the order we think about them in — not the order they appear in a catalogue.

Sections covered
Conduit 40 × 40 to 80 × 200 mm
The real question
Can it be serviced without stripping the frame?
Hidden cost
A burr, a cut edge, a die nobody needed
Read
13 minutes
Three silver anodised aluminium T-slot extrusions showing cross-sections on a factory inspection bench

Short answer

Yes to all three, with some numbers attached. Our conduit range runs from 40 × 40 mm at about 0.62 kg/m to 200 × 80 mm at about 3.40 kg/m, in 6063-T5, with six PA6 nylon or ABS end-cap sizes covering the same 40 × 40 to 80 × 200 mm range. Cable entries and mounting holes are drilled or milled on CNC centres to your drawing at ±0.2 mm on position, then deburred and radiused before the set ships — because a sharp hole edge is what quietly strips insulation on a vibrating machine. Snap-in or screw-fixed caps, cover strips and splice plates are bagged with the duct set by assembly. Standard equal-leg angles from 20 × 20 × 3 mm to 100 × 100 × 15 mm are available from stock for cutting and drilling in one to two weeks; a new die starts from about 1 t per section, with a written feasibility reply in one working day and a first article in 7–10 working days on 6063. And against steel, the honest answer is not that aluminium is stronger. It is that aluminium is about a third of the density, does not need its cut edges re-coated, and can arrive with the holes already in the right place.

Aluminium profile samples with inspection documents and a micrometer on a factory inspection bench
[01]

Three questions, and the one nobody actually asks

Let’s be blunt about what these questions are really doing.

“How do I use conduit profiles with snap-in covers?” Nobody asks this because the cover is hard to push in. They ask because they have been burned before. A machine ships, commissioning adds two sensors, and the only way to get a cable to them is to strip half the guarding. Or a cover pops off under vibration and disappears into a conveyor. Or everything looks fine until a cable faults six months later, and the insulation has been rubbed through at a drilled hole that was never deburred. So the real specification is serviceability: can I open it, add a cable, and close it again in five minutes without tools I do not have?

“Aluminium wireway vs steel cable tray?” This one is rarely a materials debate. Somebody has to write a line in a purchase justification, and they need a reason that survives a finance review. Unit price is easy to put in a spreadsheet. The second person needed on a lift, the touch-up zinc on every site-drilled hole, and the frame that has to be upsized to carry the tray are not. A buyer asking this question is asking for the rest of the invoice.

“Standard vs custom angle?” Here’s the thing: almost nobody wants a custom die. They want to know whether the standard part will quietly cost them more in machining and assembly time than a die would have. That is a quantity question, not a geometry question. If the answer is 300 kg, we will usually try to talk you out of the tooling.

Notice the pattern. None of these questions is about the day the parts arrive. They are all about the day after, and the day three years after that. So that is how this article is arranged: what to decide before the order, what we do to the parts before they ship, what happens at assembly, and what happens when the machine changes. The catalogue numbers are in there, but they are in service of that sequence.

One more thing, because it saves a lot of back-and-forth. The drawing and the cable schedule have to arrive together. A conduit section chosen from a nice photograph, without knowing how many cables of what diameter are going into it, is a guess. We will ask for the schedule before we confirm the size. That is not bureaucracy; the cavity is what decides whether the run works.

Where these projects usually go sideways

The section gets picked first, the cable schedule arrives second, and the entry holes get drilled on site. Each of those three decisions is cheap on its own. Together they produce a duct that is 20 per cent too full, a hole with a burr on it, and a maintenance job that needs the machine stripped. Send the cable schedule first and the other two mostly solve themselves.

[02]

Pick the cavity, not the outside size

A 40 × 40 conduit with a 32 × 8.2 mm internal cavity gives about 262 mm² of usable space, sized for a 40 per cent working fill ratio. That last number is the one to design to. Fill a duct to its physical area and you cannot pull a cable out later, you cannot add one, and you have built a heat problem into a signal bundle.

The 40 × 80 step is where a lot of automation frames should start rather than end. Its 66 × 11 mm cavity is about 726 mm², and the reason is not just “more room”: it is wide enough to keep power and signal physically separated in one duct. If the power side is fed from a VFD, say so on the drawing. We will confirm the divider arrangement — extruded rib, clip-in strip or a two-channel die — and whether that divider has to be bonded to earth. A custom divider rib die starts at about 1 t, so it is worth knowing early whether the standard separation works for you.

At the other end, the 200 × 80 duct is a production-line part, not a machine-frame part: 2.5 mm walls, roughly 146 cm² of internal free area, six Ø4 mm mounting holes (three through each wide face), a 10.2 mm base groove with an 8 mm mouth for 40 series hardware, and splice plates for the joints. Long unsupported runs and joint spacing become the design questions there, along with thermal expansion across a plant floor.

Section Internal cavity Wall Mass, kg/m Indicative USD/m
40 × 40 ≈32 × 8.2 mm, ≈262 mm² 1.2 mm 0.62 1.35 – 2.35
40 × 80 ≈66 × 11 mm, ≈726 mm² 1.5 mm 1.15 2.40 – 4.10
60 × 120 On the die drawing On the die drawing 1.75 4.20 – 6.80
80 × 160 On the die drawing On the die drawing 2.35 5.60 – 8.90
80 × 200 ≈146 cm² free area 2.5 mm 3.40 7.80 – 11.60

Those are our catalogue sections in 6063-T5, mill finish Ra 1.6 or anodised 10–20 µm in natural silver or black, to EN 755-9 and GB/T 6892 with ±0.15 mm on wall. Two of the five do not have published cavity dimensions here, and we have left them that way on purpose: the cavity belongs to the die, and a plausible number copied from a different section is worse than a written confirmation. Ask for it on the quotation drawing.

On commercial terms, the small section runs at 1,000 m MOQ and 15–25 days after deposit; the 40 × 80 at 800 m and 18–28 days; the 80 × 200 at 300 m and 20–30 days. Six-metre stock ships in bundles of 40, 25 and 20 lengths respectively on timber bearers. That spread is worth noticing as you move up the range: the big duct costs more per metre but asks for a smaller commitment and a longer run, which is usually the right trade for a production line and the wrong one for a single machine.

[03]

The cap is a service decision, and the hole is a wear decision

End caps are the part buyers tend to leave until the end of the enquiry. That is a mistake, because the cap decides whether the end of the duct is a finished, cleanable, gland-ready termination or a piece of black tape and a cable tie.

Our cap tooling covers the same six sections: 40 × 40, 40 × 80, 60 × 120, 80 × 80, 80 × 160 and 80 × 200 mm. They are injection moulded in PA6 nylon or ABS, both UV stabilised, in black, grey, or colour-matched to the anodised sample. Cable entries come blank, 1 × Ø16, 1–2 × Ø20, or 3 × Ø20 mm, radiused and sized to standard M16 or M20 glands. Fixing is either a snap-fit detent or a screw-fixed version — and that choice is not cosmetic. If a gland is being tightened into the cap, use the screw-fixed one. Snap-fit is for a cover you intend to take off again.

Cap size Material and colour Cable entry Fixing Mass / indicative price
40 × 40 to 80 × 200 mm (six sizes) PA6 nylon or ABS, UV stabilised; black, grey or matched Blank, 1 × Ø16, 1–2 × Ø20, 3 × Ø20; M16 / M20 glands Snap-fit detent or screw-fixed 6–38 g; 0.12 – 0.95 USD/pc
Cover strip, 6 / 8 / 10 mm slots Rigid PVC or flexible TPE; 6.2 / 8.2 / 10.2 mm wide Closes the slot flush; conceals cable and fastener heads Snap-in barb (removable) or press-in (permanent) 2 m lengths, 50 per bundle

Cap moulding holds ±0.2 mm on detent and entry positions and ±0.3 mm on mating dimensions to DIN 16901. Cable entry drilling and de-flashing are part of the process, not an extra. MOQ is 500 pieces, packed 200 to a poly bag by size with cartons labelled by section and colour, 15–25 days. Colour matching to an anodised sample is free from 2,000 pieces. Custom entry sizes mean new tooling, quoted against the section drawing.

The snap-in cover strip is a different part with a different job. It closes an open T-slot flush so there is no gap to trap swarf or cleaning fluid, and it hides cable and blind-joint fastener heads. It comes cut to member length for OEM kits, with ±0.15 mm on width, and food-contact grade PVC can be supplied with a migration test certificate. Choose the removable barb for a machine that will be modified; the press-in version is permanent, and that is fine until the day it isn’t. On washdown frames, also tell us whether the duct needs a gasket groove: IP-rated covers need a machined groove, and a cover strip alone will not give you a seal.

Now the part that actually protects the cable. Cable entry slots and openings are machined to drawing on CNC centres, mounting holes are drilled to pattern, ends are notched, and every cut is deburred and radiused. Hole position holds ±0.2 mm and cut length ±0.5 mm. On the 80 × 200 duct, deburring and end radiusing are explicitly in the routing, along with splice plates and drilling of the six Ø4 mm holes on both faces.

Why make a fuss about a burr? Because a burr costs nothing on the day and costs a call-out six months later. A drilled hole made on site with a hand drill leaves a raised lip; the cable moves a fraction of a millimetre every time the machine cycles; eventually the insulation is through to the conductor. Nobody sees it happening. Deburring at the factory, on a bench, with the cable schedule in front of the operator, is about the cheapest insurance on the whole machine.

One sequencing trap. Machine the holes before anodising, or specify the machined faces as mill finish from the start. Machining after anodising exposes bare aluminium at every cut, and a 15 µm anodic film takes roughly 15 µm off a bore diameter because both sides grow inward. Either way it belongs on the drawing, not in an email. Our cutting and tapping tolerances article works through the arithmetic; the fabrication routing shows where the sequence decision is made.

Packing is part of the same idea. Covers, dividers and end caps are bagged with the duct set by assembly. Anodised lengths are interleaved and protected against scratching. On long runs, cut lengths are bundled in run order, with splice plates and joints bagged with the matching length. That is not tidiness for its own sake — it is the difference between a fitter working down a list and a fitter hunting through a pallet.

[04]

Aluminium versus steel: the invoice nobody writes down

Fair question. And the honest answer starts by admitting where steel wins: on the line item, a galvanised steel tray is usually cheaper per metre. If that is the whole calculation, stop here.

It rarely is, though.

Weight. Aluminium is about 2.70 g/cm³, steel about 7.8 g/cm³ — roughly three times the density for the same volume. Our conduit range runs 0.62 to 3.40 kg/m; an equivalent steel section carries something like three times that before you even compare wall gauges. That weight shows up twice: in the frame that has to carry the duct, and in the freight and handling of a long run. It also shows up in a very unglamorous way, which is whether one fitter can lift a 6 m length or whether you need two people and a lift for the afternoon.

Corrosion. Aluminium protects itself with an oxide film, and we can thicken it to 10–20 µm by anodising. Steel relies on a coating, and the coating is intact right up until somebody drills a hole through it on site. Washdown areas, food plants with caustic cleaners, coastal sites and any frame that gets hosed down are exactly where that cut edge starts the rust. We would rather not quote you a salt-spray hour count as a service life: as we explain in corrosion and salt spray interpretation, those numbers rank a finish against another finish in a test, they do not predict years on your floor. What we will say plainly is that a pre-milled, deburred hole in anodised aluminium arrives finished, and a site-drilled hole in galvanised steel arrives as a maintenance item.

CNC cutouts. This is where the two materials stop being comparable as catalogue items. We machine cable entry slots, openings and mounting holes to your drawing on CNC centres, hold ±0.2 mm on hole position, deburr and radius the edges, and ship the covers and caps with the matching length. With steel, every site cut is a new bare edge to clean, prime and touch up, and every one of those touch-ups is a place the coating can fail later. The aluminium part also has a limit worth stating: machine it before finishing, or accept bare aluminium at the machined face. We will not pretend that trade-off does not exist.

Electrical behaviour. An aluminium duct is conductive, which is useful for bonding, but it is not automatically an earth. If a divider separates power from signal, the drawing has to say whether that divider is bonded and where. That is a design decision, not something the extruder can guess, and it is one of the questions we ask when a VFD is in the cable schedule.

The line we would put in a purchase justification

Steel wins on the purchase price. Aluminium wins on the parts of the cost that never appear on that line: the frame upsizing, the second fitter, the touch-up coating on every field-drilled hole, and the hour spent fault-finding a cable rubbed through at a burr. If the machine will be modified, washed down, or shipped assembled, those costs are real. If it is a fixed, dry, indoor run that will never be opened again, steel may well be the right answer, and we would say so.

For the general comparison of finishes and film ranges, see Anodising vs Powder Coating. The same sequence logic applies to the frame members around the duct; our 15 to 60 series guide covers the section data you need if the duct is mounting onto a T-slot frame.

[05]

Standard angle: the list, and the point where a die starts to make sense

Equal-leg angle is the least glamorous part of a machine frame and one of the most useful: corner gussets, diagonal braces against racking, edge protection and trim, mounting rails for benches and guards. It is also cheaper than T-slot for a solid L, which is why it keeps showing up in designs that otherwise use modular framing.

Here is what we hold or cut as standard in 6063-T5 and 6061-T6. The full range is 10 × 10 mm to 100 × 100 mm, wall 1.5 to 15 mm, 0.07 to 5.13 kg/m. Use 6061-T6 where the corner is structural, 6063-T5 where it will be welded or where the finish matters. Mill finish as extruded, or clear/black anodised at 10–15 µm.

Equal-leg section Wall Mass, kg/m Supply
20 × 20 × 3 mm 3 mm ≈0.30 Cut and drilled, 1–2 weeks
30 × 30 × 4 mm 4 mm ≈0.60 Cut and drilled, 1–2 weeks
35 × 35 × 4 mm 4 mm ≈0.71 1.85 – 2.95 USD/m
40 × 40 × 5 mm 5 mm ≈1.01 2.20 – 3.45 USD/m
50 × 50 × 9 mm 9 mm ≈2.30 Bracket form, quoted per drawing
100 × 100 × 15 mm 15 mm up to ≈5.13 Equal-leg bracket, quoted per drawing

Standard lengths are made to order with small quantities from stock; saw cutting, drilling, mitre cutting, CNC machining and deburring hold cut length ±0.5 mm and hole position ±0.2 mm. Typically one to two weeks for cutting and drilling, plus about a week for anodising. Bundles are interleaved, steel-strapped, and palletised or cased in plywood for export.

So when is a new die worth it? Three situations, in our experience. You need a feature the standard L does not have — a seal groove, a return lip, a locating rib, a specific corner radius. You need a tolerance band or an alloy/wall combination that the stock list does not cover. Or your annual volume is high enough that the tooling cost per metre disappears and you want control of the section.

And when is it not? When the geometry is close to a stock size and the quantity is small. A custom die starts from about 1 t per section. We will give you a written feasibility reply within one working day — including a no, if it is a no — checking the circumscribing circle against our press envelope (320 mm ceiling, seven lines from 800 to 1,500 t), the minimum wall for the alloy (0.8 mm on 6063, 1.2 mm on 6061 at production speed), and the tongue or fin ratio. On 6063 soft alloy, first article is 7–10 working days. Dies are H13 tool steel cut on CNC die-sinking EDM and wire EDM, vacuum heat-treated to HRC 48–52 and tempered three times. We pull the first two metres, measure wall at eight points and check twist over the full length. Because the die is cut and trialled on the same site, the loop is usually one or two trials rather than three or four — and the number of trials, not the machining time, is what actually moves your schedule.

We would rather have that conversation early. The arithmetic of tooling is in Aluminium Extrusion Die Cost, the envelope and press logic in Extrusion Capacity, and the full day-by-day path in Custom Extrusion & Die Development. If you only need 300 kg, we will usually suggest moving a hole or changing a leg length so a stock section fits. That is a five-minute drawing change against a die you would be paying off for a year.

What to put in the enquiry so the quote is usable

  • For conduit — the cable schedule: number of cables, diameters, power versus signal, VFD feed, and the working fill ratio you design to.
  • For caps and covers — section size, PA6 or ABS, colour, blank or which Ø16 / Ø20 entries, snap-fit or screw-fixed, and whether the cover is removable or permanent.
  • For machining — a drawing with entry and mounting hole positions, ±0.2 mm where it matters, the deburr requirement stated, and the machining-versus-finish sequence.
  • For angle — the stock section and length, or a dimensioned drawing plus annual volume if you think a die is needed.
  • For packing — run order, assembly-level bagging, and a packing list keyed to your BOM line numbers.
  • For records — first-article dimensional report, batch inspection record, and a 3.1 mill certificate where the alloy and temper matter.
[06]

Walking the machine’s timeline instead of the catalogue

Here is the sequence we would actually run, and it is the shortest summary of everything above.

Before the order. Fix the cable schedule, confirm the cavity and fill ratio, decide where power and signal separate and whether the divider is earthed. Pick the angle from the stock list unless a feature genuinely needs a die. This is the cheap stage to change your mind.

At first article. Check the section against the die drawing, wall at eight points on the first two metres, twist over the full length, hole positions, and — this is the one inspectors forget — run a finger or a swab around every cable entry. If there is a burr, it fails now, not after the machine ships. Check that the cap detent engages and that a gland fits the entry you specified.

On receipt. Open bundles in run order. Anodised lengths should be interleaved; if they are loose and scuffed, say so before they go onto the frame. Covers, caps, dividers and splice plates should already be bagged with the matching assembly.

At assembly. Pre-milled entries line up with the frame, so nobody reaches for a hand drill. Bond the duct where the drawing says. Fit the removable barb where the machine will change and the permanent press-in where it will not.

Three years later. Somebody adds a sensor. If the duct was sized on fill ratio, the cover is removable, and the entries were finished at the factory, that is a ten-minute job. If any one of those three was skipped, it is a shift. That single moment is what all three of the original questions were really about.

The general RFQ structure behind this is in Aluminium Extrusion RFQ Checklist; the tolerance classes named on the drawing are covered in What EN 755-9 Allows.

Four ways this goes wrong, in the order they happen

Section chosen before the cable scheduleThe duct is 20 per cent too full on commissioning day. Adding the first extra cable means pulling the whole bundle.
Entry holes drilled on siteA raised lip rubs through insulation under vibration. The fault appears months later and nobody connects it to the drill.
Steel tray cut without re-coatingEvery field-drilled edge becomes the place the corrosion starts, usually behind a panel where it is not seen.
A die opened for 300 kg — or stock angle forced to fitEither you pay off tooling for a year, or the fitter spends two days machining around a standard part that was nearly right.

Terms used in this article

Working fill ratio
The proportion of the cavity you actually fill, typically 40 per cent on our 40 × 40 section. It leaves room to pull, add and cool cables; the physical cavity area is not the design number.
Snap-fit detent
The moulded catch that holds a cap in place while still letting it be removed. Screw-fixed caps are used where a gland is tightened into the entry.
De-flashing / deburring / end radiusing
Removing the mould flash from a cap or the raised lip from a machined hole and rounding the edge. The step that stops a cable being worn through.
Divider rib
An extruded rib, clip-in strip or two-channel die that separates power and signal inside a 40 × 80 duct. Whether it is bonded to earth is a drawing decision.
Equal-leg angle
A solid L-section with two legs of the same length. Our stock range is 10 × 10 to 100 × 100 mm with walls from 1.5 to 15 mm.
Circumscribing circle
The smallest diameter enclosing the whole cross-section. It decides which press a section runs on; our ceiling is 320 mm.
Mill finish
As-extruded, untreated and machinable. Machining after anodising exposes bare aluminium at every cut, so the sequence has to be on the drawing.

Related on this site

Questions buyers ask

How do I use aluminium conduit profiles with snap-in covers for integrated cable routing on automated machinery?

Start with the cable schedule, not the section: count the cables, their diameters, which are power and which are signal, and design to about 40 per cent working fill. Our 40 × 40 section has a 32 × 8.2 mm cavity (about 262 mm²); the 40 × 80 has 66 × 11 mm (about 726 mm²) and can take a divider rib to separate services. Mount the duct on the frame slot, have cable entries and mounting holes CNC-milled to your drawing and deburred, then close it with a removable snap-in barb cover or a gasketed cover if you need an IP rating. Use screw-fixed PA6 or ABS end caps where M16 or M20 glands are fitted. The point of doing it this way is that a fourth cable three years later means lifting a cover, not stripping the frame.

Aluminium conduit wireway extrusions vs steel cable trays: corrosion resistance, weight, and CNC cutout options?

Aluminium is about 2.70 g/cm³ against roughly 7.8 g/cm³ for steel, so an equivalent section is about a third of the weight; our range runs 0.62 to 3.40 kg/m. It protects itself with an oxide film, optionally thickened to 10–20 µm by anodising, and does not need site-drilled edges re-coated the way galvanised steel does. We machine cable entry slots and mounting holes on CNC centres to ±0.2 mm, deburr and radius every edge, and ship covers, caps and splice plates with the matching length. The honest limits: steel is usually cheaper per metre, and aluminium must be machined before anodising or the machined face will be bare. We would not quote a salt-spray hour count as a service life — it ranks finishes in a test, it does not predict years on your floor.

Standard vs custom aluminium angle profiles (L-profiles) for industrial machine framing and edge protection?

Standard equal-leg angles run from 10 × 10 mm to 100 × 100 mm with walls 1.5 to 15 mm and 0.07 to 5.13 kg/m: common sizes include 20 × 20 × 3, 30 × 30 × 4, 35 × 35 × 4, 40 × 40 × 5, 50 × 50 × 9 and 100 × 100 × 15 mm, in 6061-T6 for structural corners or 6063-T5 for welding and finish. Cutting and drilling typically take one to two weeks, plus a week for anodising, with small quantities from stock. A new die starts from about 1 t per section, with a written feasibility reply in one working day and a first article in 7–10 working days on 6063. Open a die when you need a seal groove, a return lip, a tighter tolerance band or enough annual volume; for a few hundred kilograms, changing a hole position to suit a stock section is almost always cheaper.

What conduit sections do you cover from 40×40 to 80×200 mm, and which end caps fit?

Five extruded conduit sections: 40 × 40 (0.62 kg/m), 40 × 80 (1.15), 60 × 120 (1.75), 80 × 160 (2.35) and 80 × 200 (3.40 kg/m), all 6063-T5 to EN 755-9 and GB/T 6892, mill finish Ra 1.6 or anodised 10–20 µm. End-cap tooling covers six sizes: 40 × 40, 40 × 80, 60 × 120, 80 × 80, 80 × 160 and 80 × 200 mm, in UV-stabilised PA6 nylon or ABS at 6–38 g per cap. Entries are blank, 1 × Ø16, 1–2 × Ø20 or 3 × Ø20 mm for M16 / M20 glands, with snap-fit detent or screw fixing. Cap MOQ is 500 pieces, packed 200 per bag, 15–25 days.

Do you CNC pre-mill cable entry holes and deburr them before shipping?

Yes. Entry slots, openings and mounting holes are drilled or milled on CNC centres to your drawing, with ±0.2 mm on hole position and ±0.5 mm on cut length, followed by notching, deburring and end radiusing. End caps are drilled and de-flashed, and cover strips are cut to length and deburred. It matters because a raised lip left by a site drill rubs through cable insulation under vibration, and the fault appears months later. Specify the machining-before-finish sequence on the drawing: machining after anodising exposes bare aluminium at every cut, and a 15 µm anodic film takes roughly 15 µm off a bore diameter.

When is a new angle die worth it, and what is the minimum run?

About 1 t per section is the practical starting point for custom die extrusion. We give a written feasibility reply within one working day, checking the 320 mm circumscribing circle ceiling, the minimum wall (0.8 mm on 6063, 1.2 mm on 6061) and the tongue or fin ratio, then cut and trial the die on the same site for a first article in 7–10 working days on 6063. It is worth it when you need a feature stock angle cannot provide or when annual volume absorbs the tooling. For a few hundred kilograms, we will normally propose adjusting the drawing to a stock equal-leg section instead — that is a five-minute change against a die you would be paying off for a year.

Send the cable schedule, not just the section number

Give us the cable list, the entry positions, the machine environment and the angle you had in mind. You will get a written reply confirming the fill ratio, whether a stock section or a new die is the cheaper route, and what the cap and cover set can carry — including a written no, if the geometry will not run.

Request a feasibility reply


Related reading

Twelve more engineering notes from this blog, picked for this article — plus every category below.

Leave a Reply

Your email address will not be published. Required fields are marked *