Six KUKA stations, yellow-and-black posts, welded mesh on the sides and clear polycarbonate where the operator needs to see the arm. On paper that is a fencing order. In a European or North American plant it is a compliance file, a shutdown window, a colour sample someone signed in March, and a spare-parts promise that has to hold for the next station too. We extrude and machine the frame in Foshan. Here is how that kind of enquiry actually gets decided, and what has to be in the box when it ships.

The buyer
Integrator PM or plant procurement
The real deliverable
A verifiable, repeatable guard set
Non-negotiable
Whole-machine compliance stays with the integrator
Read
15 minutes
Modular aluminium T-slot workbench with mesh safety enclosure in a factory

Short answer

We can supply the modular guard set: 40 × 40, 45 × 45 heavy and 60 × 60 T-slot posts, panel blocks and continuous clamping strips for mesh and polycarbonate, base plates and anchors, hinged or sliding door sets with hinges, stops and brackets, all cut, drilled and kitted by station, in RAL 1023 yellow and RAL 9005 black powder. What we cannot supply is the compliance sign-off. An aluminium profile has no safety certification. ISO 13857 safety distances, ISO 14120 guard design, ISO 14119 interlocking and the achievable performance level under ISO 13849-1 belong to the whole machine and are verified and declared by the integrator. Ask us for the frame data, the finish records, the first-article report and a BOM keyed to your station numbers; ask your integrator for the risk assessment, the distance calculation and the declaration. That split is not us being careful with wording. It is the only arrangement that survives an audit.

Silver aluminium T-slot frame with a clear polycarbonate panel fastened by panel brackets
[01]

Picture the person asking

Let’s start with who is actually on the other end of this enquiry, because it changes what a good answer looks like.

It is almost never the engineer who designed the robot cell. It is a project manager or a buyer at a systems integrator, or a plant engineer on the end-user side, who has six stations to hand over in one programme. They have a layout drawing, a commissioning date, a safety engineer who will review the result, and a purchasing system that wants one part number per line. They are judged on whether all six cells start on the same week — not on whether the extrusion is elegant.

That person sits in a decision chain that looks roughly like this, and it matters because every question they ask is shaped by the step they are standing in:

1. Risk assessment. Somewhere upstream, an engineer works through ISO 12100: hazards, risk estimation, risk reduction in order. For an industrial robot, ISO 10218-1 and ISO 10218-2 — both revised in 2025 — set the frame for the robot system and its integration. 2. Distance and guard concept. From the reach envelope and the mesh aperture comes the minimum standoff under ISO 13857, and from that the fence footprint. 3. Guard design and access. ISO 14120 for fixed and movable guards, ISO 14119 for interlocking devices, ISO 13849-1 for the safety-related control system and its performance level. 4. The technical file and declaration. In the EU, conformity is for the whole machine; the integrator or machine builder signs the declaration under the Machinery Directive 2006/42/EC and, from January 2027, Regulation (EU) 2023/1230. In the US there is no CE declaration, but OSHA machine-guarding requirements, ANSI/RIA R15.06 and ANSI B11.19, the insurer’s survey and the plant’s own lockout and acceptance procedure do a very similar job of asking “show me the file”. 5. Procurement. Only now does somebody order the fence. 6. Installation and acceptance. Hot work permits, floor anchors, door gaps, and a sign-off visit.

Notice where the fencing supplier sits. Step five. We are two steps after the safety decisions and one step before the acceptance visit. That is exactly why the three questions below feel hard to answer cleanly: they are step-five questions about step-two and step-four problems.

Now the uncomfortable part, and we will say it plainly because it saves everyone time. A profile is not a safety device. Slot-based framing is a good structure and a poor safety fence on its own: a slot that accepts an M8 bolt is also an opening, and a thin panel in a slot may contain nothing at all. Our own 40 × 40 machine guard frame is described as built to ISO 14120 principles, and its own note says compliance is machine-specific and must be verified by an engineer for the hazard in question. We will happily supply the frame, the data and the records. We will not sign your declaration, and you should be suspicious of any component supplier who offers to.

What the buyer is really buying

Not six fences. Six identical, traceable sets that a safety engineer can check, a fitter can assemble without a hot work permit, a plant can reconfigure when the robot changes, and a purchasing system can reorder for a seventh cell two years later without a colour argument. Every one of the three questions below is a different way of asking whether that is what they will get.

[02]

What the three questions are actually deciding

Taken literally, the three questions are about installation speed, a standard, and a rattle. Taken seriously, they are three purchase-decision problems.

“Modular aluminium versus welded steel: speed, reconfiguration, cost.” Nobody is comparing two line items. They are comparing two shutdown plans. A welded steel guard means fabrication drawings, site welding, a hot work permit, grinding, painting, and a paint touch-up where the weld burned the coating. Inside a running European or American plant, a hot work permit is a scheduling event with a fire watch attached, and it can stop the neighbouring line. A bolted aluminium guard arrives cut, drilled and kitted; the fitter needs a torque wrench, not a welder. Then the robot is re-tooled eighteen months later and one bay has to move. The steel answer is an angle grinder; the aluminium answer is a spanner. So the honest comparison is not price per metre, it is the cost of the second and third time you touch it. Six stations make that arithmetic much bigger, because reconfiguration happens six times.

“How do I design an ISO 13857 compliant perimeter with 40 and 45 series profiles?” Here’s the thing: the word doing all the work in that sentence is “compliant”. A buyer who writes “ISO 13857 compliant fence” into an RFQ is usually trying to transfer a verification duty to a supplier. It cannot be transferred. ISO 13857 relates the size of an opening to the minimum distance from that opening to the hazard zone; it needs the robot’s reach envelope, the approach direction, the floor plan and the risk assessment. A profile series cannot be compliant on its own. What we can do is give the integrator the geometry that makes their calculation possible — mesh aperture, standoff, post spacing, deflection under a stated load, door gap — and put it in the technical file. That is a much more useful answer than a certificate-shaped piece of paper.

“Best way to mount welded mesh and polycarbonate panels without rattle?” A rattle is a noise complaint right up until it is a gap. Robot cells vibrate; a point-supported mesh panel buzzes against its clips, a polycarbonate sheet expands more than the aluminium holding it, and a door with a 10 mm gap around it is a far worse guard than the panel specification suggests. The question sounds like a fitting question. It is really asking whether the assembly will still be tight, quiet and dimensionally honest after a year of cycles — and whether the acceptance inspector will find a reachable opening the drawing did not show.

Three questions, one concern: will this still be defensible after the machine is running? Everything below is arranged around that.

[03]

The BOM: one line per thing that has to arrive

Here is the part we can actually commit to. Three post sections cover most robot-cell perimeters, and the choice between them is a span and impact question, not a colour question.

Post section Slot / pitch Mass Where it belongs Indicative
40 × 40 (light / standard / heavy) 8 mm mouth, 30 mm pitch, M6 / M8; Ø12 mm core, M14 tap 1.30 – 2.35 kg/m Standard panels, door leaves, most of the perimeter 2.65 – 4.40 USD/m; 500 m MOQ
45 × 45 heavy 8 × 8 mm groove, 33 mm pitch, M10; 2.6 mm wall ≈3.15 kg/m, I ≈19.5 cm⁴ Long bays, tall posts, impact-driven sizing 4.20 – 6.80 USD/m; 300 m MOQ
60 × 60 10.2 mm mouth, 48 mm pitch, M8 / M10; Ø12 mm core, M14 tap ≈4.30 kg/m, I ≈26 cm⁴ Column duty, wide gates, tall or heavily loaded runs Quoted per metre; 400 m MOQ

All three are 6063-T5 to EN 755-9 and GB/T 6892 with ±0.15 mm on wall; 6061-T6 is available on request. One detail that is easy to miss on a six-station order: if the 60 × 60 is a column, it needs square end facing and M14 tapping; a beam does not. Tell us the height and we will flag whether a mid-height restraint is needed. That is a five-minute note on the drawing, and it prevents six wobbly corners.

The rest of the set is where a fencing RFQ usually goes thin. People remember the posts and the mesh and forget the clips, the strip, the anchors and the door hardware — then the container arrives and the fitter is short 400 blocks. Here is the full list we quote against.

Position Component What it fixes Spec to put on the PO Quantity basis
1 Posts and rails The structure 4040 / 4545 heavy / 6060, cut ±0.5 mm, holes ±0.2 mm, end square 0.3 mm Per station, from the frame sketch
2 Mesh clip blocks Holds welded wire mesh without drilling profile or panel 1.5–12 mm panel, 6 / 8 / 10 mm slots, PA6 / aluminium / zinc-plated steel, M5 / M6, ±0.2 mm throat Block spacing calculated from panel thickness and load
3 Continuous clamping strip PC view panels; stops bow and rattle along the whole edge 2–12 mm panel, PVC / aluminium / EPDM, cut to member length, covering-lip option, ±0.2 mm Per panel edge, or 2 m lengths
4 Captive nut blocks Threaded fixings anywhere along the slot M5 / M6 / M8 / M10, 4–35 Nm, ±0.15 mm on thread position Counted from the panel drawing
5 Base plates / flanges Anchors the leg and spreads the floor load 40 × 40 to 200 × 200 mm, 6 / 8 / 10 / 12 / 15 mm thick, 2 or 4 holes for M8–M16 anchors One per post; check floor bearing
6 Sealed base plate option Keeps water and swarf out of the profile core 80 × 120 × 8 mm, 4 × M8 end taps, 4 × Ø11 mm for M10 anchors, 2 mm closed-cell EPDM gasket Washdown or coolant-exposed bays
7 Fixed feet / adapter plates Repeatable frame height across all six cells 60 × 60 to 100 × 100 mm base, 4 × M6–M10, 20–60 mm height, 700–2,200 kg static per foot Where the floor is level and no levelling is needed
8 Hinged or sliding door set Operator access 40 × 40 leaf, 60 mm overlap per side on sliders, captive bottom guide, EPDM or brush seal, rail sized to span One set per access point
9 Hinges, stops, buffers, handle, latch The door stays square and closes quietly 180° hinge, 8.2 mm European geometry for M8, factor 2 on hinge moment, 100,000-cycle rating, 40 mm buffer stroke Hinge count from door mass and height
10 Interlock interface Mechanical provision only Bracket and switch position per integrator’s ISO 14119 / ISO 13849-1 design Integrator selects and certifies the switch
11 End caps and slot covers Closes open slots and profile ends PA6 / ABS for 15 × 15 to 60 × 120 mm; PVC / TPE strip for 6 / 8 / 10 mm slots Every exposed end and open slot
12 Kitting and labels Six identical, traceable sets Bagged by station, cartons labelled with station number, drawing revision and colour One kit per cell plus a spares kit

Two things in that table deserve a second look. First, position 3: a continuous strip does a different job from clip blocks. Blocks are point supports and a panel between them will bow and buzz; a strip supports the whole edge, spreads the impact load and can hide the panel edge. Second, position 10: we supply the mechanical provision for an interlock, not the safety-rated switch. The integrator owns the safety function, the wiring architecture and the performance level. If a supplier offers to bundle a “certified interlock package” without asking about your ISO 13849-1 architecture, that is a red flag, not a saving.

On doors, one number worth carrying into the design review: a 40 × 40 rail over 2 m carrying a 30 kg leaf sags roughly 9 mm. Rail depth is chosen from the unsupported span, not from the catalogue page. Our hinge moment and buffer energy guide works the rest of it through — 88 N·m per hinge for a 20 kg door at factor 2, and 3.1 J absorbed over 40 mm instead of 2 mm of metal-on-metal contact.

Send this and the BOM can be quoted in one pass

  • Frame sketch per station — post positions, heights, bay widths, door locations and which bays are mesh versus polycarbonate.
  • Risk-related geometry from the integrator — mesh aperture, minimum standoff under ISO 13857, allowable deflection, and the door gap that will be accepted.
  • Infill details — actual mesh wire and aperture, actual PC thickness (not “3 mm nominal”), and whether the PC needs an oversized or slotted fixing for thermal movement.
  • Floor and anchors — floor type, anchor size, whether a sealed gasketed base plate is needed, and any washdown exposure.
  • Door hardware — hinged or sliding, door mass and width, handle and latch side, interlock bracket position, and the switch model chosen by the integrator.
  • Finish — RAL 1023 and RAL 9005 references, which faces are which colour, gloss, film thickness and the approved-sample procedure.
  • Records and packing — first-article dimensional report, 3.1 mill certificate, coating thickness record, and station-numbered kits plus a spares list.
[04]

Yellow and black is a specification, not a paint job

Six cells, one colour. That phrase is where a surprising number of fencing programmes come apart.

Our powder line works to any RAL shade, so RAL 1023 traffic yellow and RAL 9005 jet black are custom colours we can run — but they are not stocked colour numbers, and we will not pretend otherwise. They get quoted as a controlled finish: an approved physical sample, signed and dated, retained at the line, with the batch measured against it. That is not fussiness. The twelfth batch in November has to match the sample somebody signed in March, across six stations assembled by different fitters in different weeks.

The specification clause we would put on the PO reads like this: polyester powder to Qualicoat Class 1 / AAMA 2604; colour to the approved retained sample; film thickness 80 µm nominal with a 60 µm minimum on all visible faces, measured to ISO 2360 at five points per length; adhesion cross-cut Gt0 to ISO 2409 on a production part, not a test panel; edges and machined faces fully covered, with no bare aluminium visible after assembly. Our catalogue range runs 60–80 µm powder on these parts, so the clause is inside what we actually hold. Corrosion testing such as 1,000 h neutral salt spray to ISO 9227 is a project-level requirement to agree and record for these specific colours, not a number to copy from a different RAL sample in a brochure.

Two practical traps with a two-colour guard. First, yellow and black means masking and a second pass, so the sequence has to be on the drawing: which faces are yellow, which are black, where the boundary lands on a corner, and whether the door frame follows the adjacent panel. Second, powder pulls back from sharp corners, and the minimum film lands on the edge that takes the impact. That is the place a forklift touches, and it is also the place a thin film fails first. Our surface finishing page sets out the four batch-control points; the short version is that a colour drift is almost always a missing sample or an unmeasured edge, not bad luck.

One more sequencing decision, and it is the one that quietly saves a rework loop: machine before coating. Cut lengths, holes and panel grooves are done on the profile, then the parts are powder coated, then the fence is assembled with clip blocks and strips that need no drilling. Drilling after coating exposes bare aluminium at every hole and puts you back at the “no bare aluminium visible” clause. If a face has to be machined later, specify it as mill finish from the start.

Why we ask for a signed sample on a six-cell order

Because the sixth cell is assembled after the first one has already been photographed for the handover file, and a yellow that is “close enough” is very visible in that photograph. One retained sample, one dated approval, and five-point thickness records per batch turn a subjective colour argument into a checkable line item. It also gives your technical file something real to hold.

[05]

Mesh, polycarbonate, and the gap nobody drew

Now the fastening question, which is also the compliance question.

ISO 13857 relates opening size to the minimum distance from the opening to the hazard zone. The values below are the approximate relationship we use when discussing a guard with an integrator; the integrator verifies the actual distances against the machine.

Opening size What can pass through Order of minimum safety distance
Up to about 4 mm No useful fingertip entry; a thin probe could Very small, a few millimetres
4 – 8 mm Fingertip and part of a finger 10 – 20 mm
8 – 12 mm Finger past the first joint 80 – 100 mm
12 – 20 mm Finger and part of the hand 120 mm or more
20 – 30 mm Hand to the thumb base Around 200 mm
30 mm and above Whole hand, then the arm Several hundred mm, rising towards 850 mm and beyond

That table is a floor-space argument as much as a safety argument. Fine mesh under 8 mm lets the guard sit close to the robot and saves floor space, but it costs more per square metre and reduces visibility and airflow. Coarse 20–30 mm mesh is cheaper and easier to see through, but it needs a standoff that can add hundreds of millimetres to the footprint of each of six cells. On a line layout, that difference is real estate. Our ISO 14120 machine guard design article works through the frame and panel side; the impact-based sizing guide explains why post spacing is usually driven by energy rather than by static load.

Why panels rattle. Four causes, in the order we see them. Point supports: clip blocks alone let a mesh panel bow between fixings and buzz against the frame, which is why a continuous clamping strip is the better answer for a tall PC window. Wrong clamping band: the common bands are 2–4, 4–6, 6–8 and 8–10 mm, and they have to be picked for the measured sheet, not for a nominal “3 mm PC”. Thermal movement: polycarbonate moves more than aluminium, so soft plastics need oversized holes or slotted clamps, and an EPDM strip gives the edge somewhere to go. And the door: a 10 mm gap around a guard door is a direct path to the hazard regardless of how good the panel is, and a door that slams into a metal stop with 3.1 J behind it will work its fixings loose within a season.

A 3 mm polycarbonate panel adds about 3.6 kg per square metre, which is why a 1800 × 900 mm door on 4040 lands near 20 kg and needs real hinge arithmetic, not two generic hinges from a catalogue. Ask for panel blocks with a protective pad where the mesh sits, and for the block spacing to be calculated from your panel thickness and load; we do that from the drawing at no charge, because a panel left without mid-edge support is the one that starts the noise.

Worth stating again: the frame is a structure, not the guard. Open slots get cover strips, exposed ends get caps, and fixed guards need a tool to remove them. A guard you can lift out by hand is a movable guard, and a movable guard needs an interlock designed into the safety-related control system. The robot cell framing article goes into why a T-slot frame is a good structure and a poor safety fence when that distinction is skipped.

[06]

From signed sample to acceptance, six times over

Put the whole thing in the order it will actually happen.

Before the order. The integrator owns the risk assessment, the ISO 13857 distance calculation, the guard concept under ISO 14120, the interlock design under ISO 14119 and the performance level under ISO 13849-1. We supply section data, panel options, a draft BOM and a written note on anything the frame cannot do. Get the drawing revision and the colour sample signed here.

At first article. Dimensional report on the first two metres: wall, overall dimensions, hole positions, end squareness, and the panel throat on strips and blocks. Film thickness at five points per length, colour against the retained sample, adhesion on a production part. Assemble one bay and one door, swing it, and measure the gap. It is much cheaper to find a 12 mm door gap now than at the acceptance visit.

In the box. Station-numbered kits: posts, rails, mesh blocks, PC strips, captive nuts, base plates and anchors, door set with hinges, stops, handle and latch bracket, end caps and cover strips, fixings bagged to each assembly. Cartons labelled with station number, drawing revision and colour. One shared spares kit for the programme, because the thing that fails on a production line is usually a hinge or a clip, not a post.

On site. A bolted guard needs a torque wrench, an anchor drill and a level floor; it does not need a welder or a hot work permit. That is the whole installation-speed argument, and on a live plant it is worth more than the difference in material cost. Reconfiguration is the same operation in reverse: unbolt, move, re-torque, and check the door gap again.

At handover. The technical file gets our dimensional report, the 3.1 mill certificate for alloy and temper, the coating thickness and colour-control records, the BOM and the door hardware data. It gets the risk assessment, the distance verification and the declaration from the integrator. Both halves are needed. Neither supplier can produce the other’s half honestly.

Two years later. Cell seven is added. Because the cut list, the colour sample and the BOM are revision-controlled, the new bay matches the first six. That is what “modular” is supposed to mean, and it is the part that never shows up in a price-per-metre comparison.

Four ways a six-cell fencing order goes wrong

“ISO compliant fence” written into the RFQThe supplier quotes a certificate-shaped document, the integrator assumes the distance calculation is covered, and nobody owns it at acceptance.
Yellow approved from a screen, not a sampleCell four arrives a shade warmer than cell one. The handover photographs make it a programme-level argument.
Mesh clipped only at the cornersThe panel bows, buzzes under robot vibration, and works the fixings loose. A 10 mm door gap is worse than any of it.
Interlock chosen by the fence supplierThe mechanical bracket fits and the safety architecture does not. Series-wired switches quietly reduce the achievable performance level.

Terms used in this article

ISO 13857
Safety distances to prevent hazard zones being reached by upper and lower limbs. It relates opening size to minimum distance; the integrator applies it to the whole machine.
ISO 14120
General requirements for the design and construction of fixed and movable guards. A fixed guard needs a tool to remove; a movable one needs interlocking.
ISO 14119 / ISO 13849-1
Interlocking devices associated with guards, and the performance level of safety-related control parts. Series-wiring interlocks reduces achievable PL.
ISO 10218-1 / -2 (2025)
Industrial robot safety standards, revised in 2025; Part 2 covers the robot system and its integration.
Declaration of conformity
Signed for the whole machine by the manufacturer or integrator under EU machinery law. A component supplier cannot issue it for a guard frame.
Approved sample
A physical, signed and dated colour reference retained at the coating line. Batches are measured against it, not against a screen or a Pantone chip.
Clamping band
The panel thickness range a block or strip holds — commonly 2–4, 4–6, 6–8 and 8–10 mm. Pick it for the measured sheet.
Hot work permit
Plant authorisation for site welding or grinding, usually with a fire watch and a shutdown window. The main reason bolted guards win on installed cost.

Related on this site

Questions buyers ask

Modular aluminium safety fencing vs welded steel machine guarding for robotic cells: installation speed, reconfiguration, and cost?

Steel is usually cheaper per metre and aluminium usually wins on installed and lifetime cost. A bolted modular guard arrives cut to ±0.5 mm, drilled to ±0.2 mm and kitted by station, so installation needs a torque wrench and an anchor drill rather than a welder and a hot work permit — which on a live European or North American plant can stop the neighbouring line. When a robot is re-tooled, the bay is unbolted, moved and re-torqued instead of cut and re-welded. Six stations multiply that advantage six times. The honest answer is that for a fixed, dry, never-changing perimeter, steel can still be the right call; for a programme that will be modified, aluminium is normally cheaper by the second change.

How do I design ISO 13857 compliant machine safety perimeter fencing using 40-series and 45-series T-slot aluminium profiles?

You do not make a profile series “compliant” — ISO 13857 relates the size of an opening to the minimum distance from that opening to the hazard zone, and it needs the robot reach envelope, approach direction and risk assessment. A 4–8 mm aperture implies a distance on the order of 10–20 mm, 20–30 mm around 200 mm, and openings of 30 mm and above several hundred millimetres rising towards 850 mm and beyond. Use 40 × 40 posts (8 mm mouth, 30 mm pitch, 1.30–2.35 kg/m) for standard panels and doors, and 45 × 45 heavy (2.6 mm wall, 33 mm pitch, about 19.5 cm⁴) where span or impact governs. We supply section data, mesh aperture, standoff, post spacing and deflection figures for the technical file; the integrator verifies the distances and signs the whole-machine declaration.

Best way to mount welded wire mesh and polycarbonate viewing panels into aluminium safety fence frames without rattle?

Use clip blocks for the mesh and a continuous clamping strip for the polycarbonate. Blocks take 1.5–12 mm panels in 6, 8 or 10 mm slots, but point supports let a panel bow and buzz; a strip supports the whole edge, spreads impact load and can hide the panel edge. Pick the clamping band for the measured sheet — 2–4, 4–6, 6–8 or 8–10 mm — not a nominal thickness, and give PC oversized holes or an EPDM strip for thermal movement. Then check the door: a 10 mm gap around a guard door is a direct path to the hazard, and a 20 kg door needs about 88 N·m per hinge at factor 2 with a buffered stop to keep it square.

What is in the full BOM for a 4040 / 4545 / 6060 aluminium safety fence, including base plates and door locks?

Twelve positions: posts and rails; mesh clip blocks (1.5–12 mm panel); continuous PC clamping strip (2–12 mm); captive nut blocks M5–M10; base plates 40 × 40 to 200 × 200 mm with 2 or 4 holes for M8–M16 anchors; a sealed 80 × 120 mm base plate with a 2 mm EPDM gasket for washdown areas; fixed feet or adapter plates for repeatable height; a hinged or sliding door set with 60 mm overlap and captive guide; hinges, stops, buffers, handle and latch; a mechanical interlock bracket; end caps and slot cover strips; and station-numbered kitting plus a spares kit. The safety-rated interlock switch itself is selected and certified by the integrator under ISO 14119 and ISO 13849-1.

Can you powder coat the guard frame in RAL 1023 yellow and RAL 9005 black?

Yes, as a controlled custom finish. Our line runs any RAL shade; 1023 and 9005 are not stocked colour numbers, so the order starts with a physical approved sample, signed and dated and retained at the line. Typical specification is polyester powder to Qualicoat Class 1 / AAMA 2604, 80 µm nominal with 60 µm minimum on visible faces measured to ISO 2360 at five points per length, adhesion cross-cut Gt0 to ISO 2409 on a production part, and full coverage of edges with no bare aluminium visible after assembly. Two colours mean masking and a second pass, so the drawing must say which faces are which. Machine all holes before coating; drilling afterwards exposes bare aluminium. Agree any project-specific salt-spray requirement for these colours in writing rather than copying a figure from a different RAL sample.

Who verifies the safety distances and interlock compliance on a robot cell?

The integrator or machine builder, always. An aluminium profile has no safety certification, and a slot that takes an M8 bolt is also an opening. ISO 13857 safety distances, ISO 14120 guard design, ISO 14119 interlocking, ISO 13849-1 performance level and the whole-machine declaration under EU machinery law belong to the completed machine, not to a component. We supply the frame, the panel and door geometry, the first-article dimensional report, the 3.1 mill certificate, coating thickness and colour records, and a station-keyed BOM. The integrator supplies the risk assessment, the distance verification, the interlock architecture and the declaration. That division is what an auditor or an insurer will expect to see in the technical file.

Send the six-cell layout, not just the mesh size

Give us the frame sketch, the integrator’s aperture and standoff, the panel and PC thicknesses, the door schedule, the floor and anchor detail, and the RAL references. You will get one BOM keyed to your station numbers, a written note on what the frame can and cannot be responsible for, and a first-article plan that includes the colour sample — including a written no if the span or the geometry will not work.

Request a guard-set quote


Related reading

Twelve more engineering notes from this blog, picked for this article — plus every category below.

Leave a Reply

Your email address will not be published. Required fields are marked *