Freestanding Plant Partition Fencing
The enquiry came in with one word in capitals: we CANNOT drill anchor bolts into the concrete. Eighty-five metres, 1,400 mm high, sixty bays, sixty-five support feet, separating AGV forklift lanes from packing stations in a Melbourne food and pharma packaging plant. That is a tidy brief. It is also a completely different engineering problem from a bolted-down fence, and most of the risk sits in the part that never appears on a quote: what happens when there is nothing holding the top. We make the profiles and the feet in Foshan. Here is how that kind of enquiry should be read.

Short answer
Yes, a free-standing 40 × 40 aluminium partition can be built for a floor that must not be drilled, but the stability comes from the foot geometry and the bay spacing, not from a heavier profile. For a 1,400 mm high run we recommend a post every 1.2–1.5 m, each on a wide support foot with a non-slip PA6 nylon levelling pad: T-shaped double-sided feet along the straight runs, L-shaped feet where the fence finishes against a wall or a fixed machine, and extra feet at ends, corners and door returns. Sixty bays over 85 m works out at about 1.42 m per bay, which is already inside that band; sixty-five feet for sixty bays is the right instinct, because the five extra positions are exactly where a cantilevered fence is weakest. One honest correction: T and L partition feet are made-to-drawing assemblies built from our base plates, 40 series posts and levelling feet — they are not a stocked catalogue item, and we will quote them against your floor build-up and layout. The final spacing and any ballast requirement should be verified by your facilities engineer against the AGV route, floor slope and local workplace-safety requirements.

Who signs off on this, and what are they afraid of
The capitals in “CANNOT drill” are the tell. That is not a preference from a fitter. It is a constraint written by the person who owns the building.
A Facilities Engineering Lead in a food and pharmaceutical packaging plant is not a buyer and not a machine designer. They look after the floor, the building fabric, the EHS case for separating pedestrians from AGVs, the cleaning regime, the fire and egress routes, and the maintenance budget. They are measured on whether production keeps running and whether the asset survives an audit. A fence to them is a facilities modification, which means it goes through a different approval path than a piece of production equipment.
That chain looks like this. First, the floor. An insulated vapour barrier under an epoxy screed is there to stop moisture coming up through the slab. Put an expansion anchor through it and you have a capillary path, a potential debond, a blister in the coating six months later, and a very awkward conversation with the flooring contractor about a voided warranty. In a washdown or hygienic zoning area, a failed floor is also a hygiene finding. Then EHS. AGV forklift lanes and operator packing stations need a physical separation that a safety officer, an insurer and, in Australia, a WorkSafe inspector will accept. Then hygiene and zoning. Cleaning chemicals, hose-down routines and the boundary between a packing zone and a traffic zone decide what the infill can be. Then installation. Eighty-five metres has to go in without stopping the line, without hot work permits, and ideally without a curing time. Finally the future. The line will be re-balanced, and the fence will have to move.
So the person writing this enquiry is not shopping for aluminium. They are buying a relocatable, auditable floor-safe asset that keeps two traffic types apart. Every number in their email is a proxy for one of those obligations. A supplier who answers with a price per metre has missed the point entirely.
The expensive mistake is not the fence
It is the floor. A partition that wobbles is annoying and fixable. A vapour barrier punctured sixty times in an 85 m run is a flooring remediation project, with production disruption attached. That asymmetry is why “no drilling” outranks every other line in the brief, and why the foot design deserves more attention than the panel.
Reading the numbers in the enquiry
Let’s take that email apart, because it is a well-written brief and it tells us more than the writer may have intended.
85 metres and 1,400 mm high. The height is the lever arm. An unrestrained partition that is 1.4 m tall behaves as a cantilever from the floor: the top edge is free to move, and any horizontal nudge at that height turns into an overturning moment at the base. Our own partition performance guide puts it plainly — where the head is not positively fixed, the top is free and the height starts to govern. The 85 m is the second half of the problem: a long run has to be restrained against sideways movement, not just kept upright bay by bay.
Sixty panel bays. Eighty-five divided by sixty is about 1.42 m per bay. That is not a random number. It sits inside the 1.2–1.5 m post spacing we recommend for a free-standing partition of this height. Whoever wrote the brief has either done this before or has had a structural conversation already. It also means the RFQ is not asking us to invent a layout; it is asking us to confirm a layout against a tipping case.
Sixty-five support feet for sixty bays. This is my favourite line. Sixty bays in a straight line need sixty-one posts, not sixty feet, and a run with corners, returns and an access gate needs more again. Sixty-five says the writer has already allowed for ends, corners and door positions — the exact places where a cantilevered fence loses its stability first. If a quotation comes back with exactly sixty feet, someone has counted bays instead of supports.
“Wide T-shaped and L-shaped Partition Support Feet (with non-slip levelling pads)”. They have described the answer’s shape, which means they have seen this solution before. What they still need from a supplier is the part they cannot see: the anti-overturning span, the pad material’s behaviour on epoxy, and whether the whole assembly can be taken apart and moved. In other words, they are not asking can you make this. They are asking will you stand behind the geometry.
There is a single underlying question behind all four numbers: if we take the anchors away, what holds it up? Everything below answers that, in the order a facilities engineer would check it.
No anchors means geometry does the work
Here’s the thing about overturning: it is not a strength problem. Our stability guide makes the same point about shelving — overturning is governed by the height of the assembly relative to its depth and where the load sits, and a tall, shallow unit is unstable no matter how strong the aluminium is. A heavier 40 series post will not fix a tipping partition. A wider foot will.
So the design recommendations for a floor you cannot drill, at 1,400 mm high, are these.
Post every 1.2–1.5 m. That keeps each bay narrow enough that a person leaning on the panel or a pallet brushing it does not create a long unsupported lever. It also means a single damaged foot does not bring down a three-metre section. On the 85 m job, 1.42 m per bay is right where it should be.
T-shaped double-sided feet on the straight runs. The base extends to both sides of the post, so the assembly resists a push from either the AGV lane or the packing side. That matters more than it sounds: the two sides see completely different loads, and a one-sided foot is fine until somebody leans from the other direction.
L-shaped feet where the run meets a wall, a column or fixed equipment. There is no room for a double-sided base there, so the foot turns into a single-sided L and the run is tied back to the fixed structure for lateral restraint. Those transition points are also where the long-run sideways restraint is picked up.
Extra feet at ends, corners and gate returns. A free end has half the restraint of a mid-run post. This is where the sixty-fifth foot goes, and why we would want to see the corner detail before confirming the count.
A non-slip PA6 nylon levelling pad under every foot. Our PA6 nylon pivot foot is specified for exactly this: it will not mark epoxy or vinyl flooring, it damps vibration, it is electrically insulating, and it takes an M8–M16 stem at 400–1,600 kg static load per foot. The ball-and-socket levelling foot absorbs 10–15 degrees of leg angle, which is what keeps the pad flat when the floor is not perfectly level. And the cup foot gives a bearing diameter up to double the profile section — in our own words, it lowers floor pressure and raises tipping resistance. That last phrase is the whole brief in six words.
| Position in the run | Foot type | Why | Pad / stem | Notes for the PO |
|---|---|---|---|---|
| Straight bays, both sides accessible | T-shaped double-sided | Resists a push from the AGV side or the packing side; widest effective base | PA6 nylon pad, 40–80 mm; M8–M16 stem | Post every 1.2–1.5 m; state the base width on the drawing |
| Against a wall, column or fixed machine | L-shaped wall-side | No room for a double base; picks up lateral restraint from the fixed structure | PA6 nylon pad; ball joint where the floor falls away | Show the fixing to the wall and the transition to the next T foot |
| Free ends, corners, gate returns | Additional wide foot | A free end has half the restraint of a mid-run post | Same pad family, so spares are common | Count these separately; this is where 60 bays becomes 65 feet |
| Long uninterrupted runs | T feet plus lateral restraint | Height keeps it upright; length needs a separate sideways check | Levelling pads take up floor slope | Ask for a written note on head condition and long-run restraint |
| Not suitable here | Drilled feet / anchor base plates | Need M8–M14 anchors into the slab | — | Explicitly excluded on epoxy, cleanroom and heated floors |
One correction we owe the buyer up front, because it changes the quotation: we do not stock a catalogue “T partition foot” or “L partition foot” as a finished part. What we supply is a made-to-drawing assembly — a wide base plate or foot body, the 40 series post, the levelling stem and the PA6 pad, cut and machined as one kit. The fixed foot base gives a 60 × 60 to 100 × 100 mm footprint at 700–2,200 kg static per foot; the heavy metal pivot foot goes to 5,000 kg per foot where side load governs; and the foot mounting plate standardises the leg end across several foot options. Those are the building blocks. The T and L geometry is quoted from your layout, not pulled off a shelf. We would rather say that in the first reply than discover it at the drawing approval.
What we will not do is hand over a stamped overturning calculation as if it were a product feature. The verification belongs with your facilities engineer, because it depends on the AGV route and speed, the floor slope, whether the top is ever braced, and the local requirements for pedestrian and forklift separation. We will supply the base widths, the foot load ratings, the post section data and the assembly drawing so that check can actually be done. The levelling foot with a drilled base is the one part in our range to rule out on this job: it is designed to take M8–M14 anchors, which is precisely what the floor forbids.
What sixty bays and sixty-five feet actually ships as
A facilities order lives or dies on the packing list. Sixty bays of 40 × 40 framing sounds simple until the container arrives and the fitter is short five feet, sixty end caps and a bag of levelling nuts. Here is the structure we would quote against, with the numbers that belong on the purchase order.
| Position | Component | Spec to state on the PO | Quantity logic | Why it is there |
|---|---|---|---|---|
| 1 | 40 × 40 posts and rails | 8 mm mouth, 30 mm pitch, M6 / M8, Ø12 mm core tapped M14, 1.30–2.35 kg/m, 6063-T5 to EN 755-9 | 60 bays at ~1.42 m, 1,400 mm high; cut ±0.5 mm, holes ±0.2 mm | The frame. Standard section, three wall options from one die family |
| 2 | Infill: mesh or polycarbonate | Actual wire diameter and aperture, or measured PC thickness — not a nominal “3 mm” | One panel per bay, plus door leaves | AGV side needs visibility and impact behaviour; packing side may need a wipe-clean face |
| 3 | Panel clip blocks / continuous strip | 1.5–12 mm blocks or 2–12 mm strip; 8 mm slot; ±0.2 mm throat | Counted from the panel drawing | Point clips alone let a panel bow and buzz as AGVs pass |
| 4 | T-shaped double-sided support feet | Base width from the layout, 40 series post, PA6 non-slip pad, levelling stem | Mid-run positions | The anti-overturning geometry on straight runs |
| 5 | L-shaped wall-side feet | Single-sided base, matched to the same pad family | Every wall or fixed-equipment termination | Lateral restraint where a double base will not fit |
| 6 | Extra feet for ends, corners, gates | Same footprint as the T feet for common spares | Allow roughly 5 over the bay count on this layout | Free ends are the weakest points in a cantilevered run |
| 7 | Non-slip PA6 nylon levelling pads | 40 / 50 / 60 / 80 mm, M8–M16, 400–1,600 kg per foot, 90 °C continuous | One per foot plus a spares allowance | Will not mark epoxy or vinyl; takes up floor slope; damps vibration |
| 8 | End caps and slot cover strips | PA6 / ABS caps for 15 × 15 to 60 × 120 mm; PVC / TPE strip for 8 mm slots | Every exposed end and open slot | No open crevice in a washdown or hygienic zone |
| 9 | Access gate set | 40 series leaf, hinge, handle, latch, stop; 60 mm overlap on a slider | One per operator crossing point | A gate removes a full-height bay; count the feet on both sides |
| 10 | Kit packing and labelling | Bagged by bay number, cartons marked with drawing revision and zone | 60 bay kits + 1 foot/spares kit | Eighty-five metres installed over a live line, in order, without hunting |
The 40 × 40 section is the right default here: it is stiff enough for a 1.4 m bay, light enough that a two-person crew can move a bay, and it takes the same 8 mm slot hardware as the panel clips, the feet and the end caps. One detail worth writing down on a food or pharma job: closed slots and capped ends are a hygiene requirement, not a cosmetic one. Our cleanroom framing article explains why an open T-slot is a crevice, and our panel fixing guide covers the clamping bands. If your cleaning regime needs a flush face, say so before we cut the cover strips.
Send this with the layout and the quote will be usable first time
- Floor build-up — epoxy screed, insulated vapour barrier, underfloor heating or raised floor; plus the flooring contractor’s warranty wording on penetrations.
- Layout drawn to scale — 85 m run, 1,400 mm height, 60 bay positions, every corner, wall termination, return and gate.
- Traffic and EHS case — AGV route, speed and likely contact, operator side loads, and the separation standard your safety officer works to.
- Ground condition — floor slope, expansion joints, drains, and any fall that the levelling pads must absorb.
- Hygiene — cleaning agents, hose-down routine, and whether the infill needs a wipe-clean polycarbonate face.
- Records — first-article dimensional report, 3.1 mill certificate, foot static-load data, and bay-numbered packing list with a spares kit.
Three floors you cannot drill, three different problems
“No drilling” gets treated as one constraint. It is three, and the foot choice changes with each.
| Floor | What actually goes wrong | What to specify |
|---|---|---|
| Epoxy over an insulated vapour barrier | An anchor punctures the membrane; moisture tracks up, the coating blisters, the flooring warranty is void. Metal feet can also scuff or stain the topcoat. | Free-standing T / L feet, PA6 nylon non-slip pads, no drilled base of any kind, floor bearing pressure checked on the widest pad available |
| Cleanroom or hygienic zoning | Open slots, exposed profile ends and rough pad edges hold residue; a painted or zinc foot may not tolerate the cleaning chemistry. | Closed slot strips, capped ends, smooth moulded PA6 pads, a wipe-clean infill face, and the cleaning agent named on the PO |
| Heated slab / underfloor services | Any penetration risks a pipe or cable; sustained warmth plus load makes some polymer pads creep; thermal movement shifts a long run. | No penetration at all, a pad rated for continuous temperature, levelling allowance for expansion, and a written note on long-run restraint |
Notice that none of the three is solved by a bigger anchor, and all three are solved by moving the stability into the base geometry. The PA6 pivot pad is rated for 90 °C continuous and does not mark epoxy or vinyl; where side loads or heat are higher, the steel or stainless heavy pivot foot is available up to 5,000 kg static per foot, but then the floor bearing pressure and the risk of marking have to be revisited. That is a trade, not an upgrade.
There is also a quiet one: an unlevel floor twists a partition built true. On an 85 m run with falls to drains, the levelling stems are what keep every pad in full contact and every bay plumb. A pad loaded only on its edge is the one that eventually walks, and a partition that has walked is a partition somebody will prop up with a strap. Specify the adjustable stem and the locking nut together.
From enquiry to a line that is still running
The sequence we would run, and the one that keeps this a facilities project rather than a construction project.
Site check. Walk the 85 m: floor fall, expansion joints, drains, AGV turning points, wall terminations, gate positions, cleaning routine. Confirm the no-drill rule in writing against the flooring warranty. This is where a sixty-fifth foot gets found, not on the packing list.
Written geometry proposal. Post spacing at 1.2–1.5 m, T feet on straight runs, L feet at terminations, extra feet at ends and gates, pad material and diameter, base widths, and a note on long-run lateral restraint. If a section cannot be made stable without a top fixing or added ballast, we say so here rather than after the container ships.
First article. Assemble one bay on representative flooring. Check the pad sits flat, the panel does not bow, the frame is plumb after levelling, and a firm push at 1,400 mm does not lift the far foot. Dimensional report, 3.1 certificate, foot load data and the pad material declaration go into the file at this point.
Kit and ship. Sixty bay kits numbered to the layout, plus a consolidated foot and spares kit. Cartons marked with drawing revision and zone. The fitter works down a list instead of sorting a pallet.
Install. No drill, no anchor, no hot work permit, no curing time. Levels are set with a spanner; the line keeps running around the work. That is the entire reason the client wrote “CANNOT” in capitals, and it is worth more than a small difference in the per-metre price.
Handover and the next move. The facilities file gets our dimensional report, material certificates, foot load data and the bay-numbered BOM. The stability verification stays with the facilities engineer. Twelve months later the packing line moves: the bays unbolt, the pads leave no holes, and the same sixty-five feet go back down in a new layout. That is what “freestanding” is supposed to buy you.
Four ways a no-drill partition order fails
Terms used in this article
- Freestanding / no-drill partition
- A partition held up by its base geometry and weight, with no anchor into the slab and no fixing at the head. It behaves as a cantilever from the floor.
- T-shaped double-sided foot
- A base extending to both sides of the post, used on straight runs where a push can come from either the AGV lane or the operator side.
- L-shaped wall-side foot
- A single-sided base for a run terminating at a wall, column or fixed machine, where a double-sided foot will not fit.
- Overturning ratio
- The height of the assembly relative to its base depth, and where the load sits. It governs tipping independently of profile strength.
- Head fixing
- A positive restraint at the top of a partition. Without it the top edge is free to move and the height governs the design.
- Vapour barrier
- The membrane under a floor screed that stops moisture rising through the slab. A drilled anchor can puncture it and void the flooring warranty.
- PA6 nylon levelling pad
- Moulded non-marking pad with an adjustable threaded stem. Our version is electrically insulating, damps vibration and is rated to 90 °C continuous.
- Bay
- One framed panel position between two posts. Sixty bays over 85 m is about 1.42 m per bay.
Related on this site
- Aluminium Partitions: The Three Performance Numbers — height, head fixing, long-run restraint and floor condition
- Shelving Stability: Buckling, Overturning, Deflection — why geometry, not alloy, governs tipping
- Cleanroom and Hygienic Framing — why an open T-slot is a crevice
- PA6 Nylon Pivot Foot — the non-marking pad for epoxy and vinyl
- Cup Pivot Foot — wider bearing, lower floor pressure, higher tipping resistance
- Fixed Foot Profile Base — 60 × 60 to 100 × 100 mm footprint
- 40 × 40 T-Slot Profile — the standard post and rail section
- Fixing Panels and Infill — clamping bands and panel support
- Aluminium Extrusion RFQ Checklist — the full list of inputs a quote needs
- Modular Safety Fencing for Robot Cells — when the guard does need a compliance file
Questions buyers ask
Can you supply freestanding aluminium partition fencing without drilling into an epoxy floor?
Yes. A free-standing 40 × 40 partition is held by wide support feet and non-slip PA6 nylon levelling pads rather than anchors, so nothing penetrates the screed or the insulated vapour barrier beneath it. We recommend a post every 1.2–1.5 m at 1,400 mm height, T-shaped double-sided feet on straight runs, L-shaped feet at walls and fixed equipment, and extra feet at ends, corners and gate returns. Drilled levelling feet and anchor base plates are explicitly excluded. The T and L feet are made-to-drawing assemblies built from our base plates, 40 series posts and levelling feet, not stocked catalogue parts.
What is the recommended anti-overturning span for a 1,400 mm freestanding partition, and which support feet should be used?
Use a post every 1.2–1.5 m, each with a wide foot and a non-slip PA6 nylon levelling pad. For 85 m split into 60 bays the spacing is about 1.42 m, which is inside that band. Overturning is governed by the height relative to the base depth, not by profile strength, so the answer is a wider base and closer posts rather than a heavier section. T-shaped double-sided feet resist pushes from both the AGV lane and the operator side; L-shaped feet pick up lateral restraint at walls and fixed machines; free ends, corners and gate returns need additional feet. Final spacing and any ballast must be verified by your facilities engineer against the AGV route, floor slope and local requirements.
Why would an 85 m enquiry ask for 65 support feet for only 60 panel bays?
Because bays and supports are not the same count. A straight run of 60 bays needs 61 posts, and every free end, corner, wall termination and gate return adds a support position where a cantilevered fence has only half the restraint of a mid-run post. Sixty-five is a sensible allowance on a layout like this. A quotation that returns exactly 60 feet has counted panels instead of supports. We confirm the count from the scaled layout, including where the T feet hand over to L feet.
What goes into the BOM for 60 bays of 40×40 freestanding AGV lane partition?
Ten positions: 40 × 40 posts and rails (8 mm mouth, 30 mm pitch, 1.30–2.35 kg/m, 6063-T5); mesh or polycarbonate infill at a measured thickness; panel clip blocks or a continuous clamping strip; T-shaped double-sided support feet; L-shaped wall-side feet; extra feet for ends, corners and gates; PA6 nylon non-slip levelling pads at 40–80 mm with M8–M16 stems; end caps and slot cover strips; an access gate set; and bay-numbered kit packing with a spares kit. Everything is cut to ±0.5 mm with holes to ±0.2 mm and bagged by bay so an 85 m run can be installed over a live line.
Are non-slip nylon levelling pads safe for cleanrooms, heated floors and epoxy?
For epoxy and vinyl, yes: our moulded PA6 nylon pad does not mark the floor, damps vibration, is electrically insulating and is rated for 90 °C continuous, with 40–80 mm diameters and 400–1,600 kg static load per foot. For hygienic zoning, pair it with closed slot strips and capped ends so there is no crevice, and name the cleaning agent on the PO. For a heated slab, no penetration is permitted at all and sustained warmth plus load means the pad material has to be confirmed rather than assumed. Where side load or heat is higher, a steel or stainless pivot foot up to 5,000 kg is available, but floor bearing pressure and marking risk have to be rechecked.
Who verifies that a freestanding partition will not tip on our floor?
Your facilities engineer, against the actual site conditions. We supply the base widths, foot static-load ratings, 40 series section data, assembly drawings, first-article dimensional report and 3.1 mill certificate. The verification depends on the AGV route and speed, floor slope and fall to drains, whether the top is ever braced, long-run lateral restraint and the local pedestrian and forklift separation requirements. A component supplier can give you the geometry and the data to check; it cannot certify the stability of an 85 m installation it has not surveyed. We would rather say that in the first reply than after the container ships.
Send the floor build-up and the layout, not just the metre count
Give us the 85 m drawing with bay positions, corners, wall terminations and gates, the floor specification and the no-drill wording from your flooring warranty, and the AGV route. You will get a written post-spacing and foot-geometry proposal, a bay-numbered BOM with the support count broken out, and the pad material recommendation — including a written no if the run cannot be made stable without a top fixing.
Related reading
Twelve more engineering notes from this blog, picked for this article — plus every category below.
Engineering DesignT-Slot Aluminum Profile Connectors: What Each Type Is Actually Good At
Materials and EngineeringIndustrial Aluminium Extrusion: Five Advantages and the Conditions Attached to Each
Engineering DesignExtruded vs Die-Cast Aluminium Corner Brackets
Engineering DesignWhat Is a 4040 Aluminium Profile? (Weight, Slot and Load)
ApplicationsIndustrial Castors for T-Slot and Lean Pipe Trolleys
Engineering DesignWho Owns the Extrusion Die After Tooling Is Paid?
Engineering Design3030 vs 4040 Aluminium Profile: Which for Your Frame
Engineering DesignConcealed T-Slot Connectors for Flush Panels
Materials and EngineeringAluminium Corrosion: Why a Salt Spray Number Is a Ranking, Not a Life
ApplicationsAluminium Profiles Across Industries: What Actually Changes From One Sector to the Next
ApplicationsESD-Safe Aluminum Profile Workbenches: Why Anodising Alone Fails the Audit
ApplicationsAluminium Profile Fish Tank Frames: Glass Load, Salt Water, and the Alloy Question